This project will evaluate all pumping units in the water system.
Long Creek Wastewater Treatment Plant – Cancelled
This project provides for up to 11 million gallons per day (MGD) of capacity at a proposed treatment plant at Long Creek, near the Long Creek pump station.
Belmont Lift Station and Forcemain
Design and construction of a Lift Station and Forcemain to transfer wastewater flows from Belmont to the Charlotte Water sanitary sewer collection system.
Beaver Dam Creek West Branch Outfall- Cancelled
This project consists of the design and construction of a sanitary sewer outfall along Beaver Dam Creek West Branch.
Beaverdam Creek Lift Station Improvements New Pump Stations – CANCELLED
This project will provide the necessary upgrades needed to support the proposed development called the River District.
Six Mile Creek PS Improvements-Cancelled
The purpose of this project is to eliminate the long shafts between the pumps and motors. Custom motor stands will be built to position the motors over the pumps. The original two motors for this pump station will also be replaced.
Taggart Creek Outfall Flow Diversion Structure-Cancelled
Project consists of the design and construction of a flow diversion structure.
PS & WAS Pipeline from Long Creek to Irwin Creek-Cancelled
Two separate lines will be needed for the solids transfer to handle the primary sludge (PS) and Waste Activated Sludge (WAS) respectively. The PS & WAS Pipelines from Long Creek to Irwin Creek will be approximately 12 miles.
PS & WAS Pipelines from Irwin to McAlpine-Cancelled
Two separate lines will be needed for the solids transfer to handle the PS and WAS respectively. The PS & WAS Pipelines from Irwin Creek to McAlpine Creek Wastewater Treatment Plant will be approximately 12 miles.