The 9th and College Storm Drainage Improvement Project is located in Uptown Charlotte within the 9th Street Right-of- Way between North College Street and the CATS Blue Line Extension light rail. The project will upgrade and replace storm drainage, sanitary sewer, and water main infrastructure within this block of 9th Street. The project will also include sidewalk, hardscape, pavement, and pavement markings replacement.
Storm Water Repair and Improvement FY2021-A
Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential and commercial properties.
Storm Water Repair and Improvement FY2021-A
Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential and commercial properties.
CMPD University
New Police Station
Fire Station 43
New Fire Station
NE Equipment Yard
New Maintenance Facility
State St. Ped Improvement
This project will provide new sidewalk, curb and gutter, drainage improvements, landscaping with Street trees, street resurfacing, and traffic calming bulb outs with small maturing trees in key locations.The project length is 0.468 Miles.
I 77 West Trade Underpass
This project will provide new sidewalk, curb and gutter, drainage improvements, landscaping with Street trees, Pedestrian lighting, artwork, a decorative retaining wall, brick pavers with benches.The project length is 0.2 Miles.
Sweden Rd. Modifications
Site Construction