The purpose of this contract is to build a complete Condenser Water Loop as designed by AME Consulting Engineers. The system will be designed using a shell and tube heat exchanger connected to the Airport’s Central Chiller Plant, chilled water piping, to provide tempered condenser water for the food concessions, water-cooled, condensing units on walk-in cooler and freezers. Contract term 90 days.
Hidden Valley Firehouse #45
Design and construct a new 2-story, 3-bay firehouse at 14,626 square feet, to be located at 5800 North Tryon Street. This facility will be a new infill firehouse that will alleviate high call volume for surrounding firehouses. A new firehouse must be built when a new “point of dispatch” is required in order to meet response time standards. The proposed facility will be located on a 2.03-acre parcel that facilitates the redevelopment of abandoned/underutilized sites and vacant sites. This location and site selection shall meet the City of Charlotte Policy for Sustainable City Facilities and Charlotte Fire Department Facilities Master Plan.
This project will pursue LEED certification. The site will incorporate solar panels and a geothermal well system with water source heat pumps.
CMPD Animal Care and Control Compliance & ADA Renovations, Phase II
Phase II Animal Care & Control renovations will address non-compliant issues per the NC Department of Agriculture and Consumer Services, Animal Welfare Section (NCDA&CS) Inspection reports issued in 2018, 2020, and 2021. Phase II will address renovations for separation of species, inadequate ventilation surfaces not impervious to moisture, slab repair, additional square footage for dog and cat housing, and if funding is available fencing and gate replacement for dog kennels. This phase also will address ADA Barrier renovations to meet international ADA code requirements.
The facility is located at 8315 Byrum Drive, near the airport. This facility is just under 30 years old and the renovations required are a direct response to the NCDA&CS inspection reports. Also, the project will incorporate renovations to address ADA barriers in the facility, such as door hardware, signs, plumbing, minor parking lot curbing, etc.
CMPD background checks will be required for all construction staff, vendors, and anyone occupying the site during construction and deliveries.
Variable Frequency Drive Maintenance and Services
The City is seeking firms to provide routine preventive maintenance and repair services for approximately 50 Variable Frequency Drives (VFDs), ranging from 208 volts to 460 volts, located at various City facilities, including the Airport. Brand names include ABB, Danfoss, Mitsubishi, Schneider Electric, and Yaskawa. VFDs will be checked as needed for a full service of the VFD (cleaning, replacement parts, etc.), and involve inspection, testing, and reporting on each VFD’s condition. The City uses VFDs in various applications involving pumps and fans for HVAC systems to achieve energy savings.
Zone 4 Field Operations Center (Construction Manager-at-Risk)
The proposed Zone 4 project will include a 36,000 sf operations center, approximately 20,000 sf of pre-engineered metal structures to house open storage, crew storage, raw materials bunkers, two (2) combination trucks, fabrication shop, and two (2) fleet maintenance bays. The project will also include demolition of existing facilities in a phased approach so as to minimally impact or impede current operations on the site. The project may also include roadway improvements to West Tyvola Road to increase accessibility to the site.
Rodgers Builders was selected as the Construction Manager at Risk (CMAR) for this project.
CANCELLED – HVAC Replacements at Wilson Air Main Terminal
This solicitation will involve replacing split system air conditioning units and reheat coils according to drawings produced by an engineer. There are five (5) split systems along with twenty-five (25) reheat coils to be replaced. This equipment was installed during the original construction of the building. In this project, we are replacing the entire system, including the controls. This project is estimated to be less than 6 months.
Catawba Pump Station Rehabilitation Project
The Project site is the Catawba Raw Water Pump Station located on Mountain Island Lake, owned & operated by Charlotte Water. The site address is 12548 Pump Station Rd, Charlotte, NC 28216. The work under this project will be primarily in Cells #2 & 3. The electrical work consists of changing the Cell #3 voltage from 2300V to 4160V, including new switchgear, synchronous motor, conduit, cable, etc. as well as re-winding an existing electric pump motor. The civil/mechanical work consists of rebuilding/replacing screens, rehabbing cone valves, and installing a new flow meter vault. The structural work consists of new electrical vault, drywall electrical room, masonry, doors, windows, louvers, and fans. This project also includes upgrades to the fire alarm system for the entire Catawba Pump Station facility.
CMPD University
New Police Station
Fire Station 43
New Fire Station