Automated External Defibrillator (AED) and Upgrade

The project scope includes the installation of Automated External Defibrillators (AEDs) throughout the terminal and parking decks to enhance safety for passengers and employees. The AED Retrofit and Upgrade project will standardize signage, locations, and AED types deployed over the Airport campus. The goal is to make wall-mounted (Pedestal, Semi-Recessed and Surface Mount) AEDs more visible and accessible to passengers, employees, and first responders during medical emergencies. It includes replacing cabinets as needed, adding new cabinets through ongoing and future terminal projects, and installing cabinets in the existing parking decks.

Fire Station No. 32 Roof Replacement

Remove and dispose of existing standing seam metal roof system (approximately 7,931 square feet) down to wood deck. Provide new roofing system to comply with Sealed Drawings and Specifications (underlayment, Standing Seam metal roof, associated metal trim and accessories).
Remove and dispose of existing Low Slope Roofing System (approximately 2,006 square feet) down to the existing deck. Provide new roofing system to comply with Sealed Drawings and Specifications (Insulation, Modified Bitumen Roof Membrane and Flashings, associated metal trim and accessories).

Firehouse #30 Replacement

Firehouse #30, currently located at 4707 Belle-Oaks Drive, near Charlotte Douglas Airport, is currently located in a house built in 1955 and needs extensive renovations. The facility is the only firehouse where crews must leave their living quarters to access their apparatus, as a result, in impacting response time.

Firehouse #30 design services with the use of Advance Planning funds will be utilized to build a replacement 3-bay 2-story firehouse to manage response volumes in the Beam Road/Airport area. The new facility will be approximately 14,000 square feet. The building will be located at 3019 Beam Road, directly across from the Police and Fire Academy, and the parcel ID number is 141-24-104. It is located in Council District 3. The firehouse design will be the same floor plan design as Hidden Valley Firehouse #45 (HVFH#45).  This project is also designated to be an all-electric firehouse and additional scope will be added.

Zone 4 Field Operations Center (Construction Manager-at-Risk)

The proposed Zone 4 project will include a 36,000 sf operations center, approximately 20,000 sf of pre-engineered metal structures to house open storage, crew storage, raw materials bunkers, two (2) combination trucks, fabrication shop, and two (2) fleet maintenance bays.  The project will also include demolition of existing facilities in a phased approach so as to minimally impact or impede current operations on the site. The project may also include roadway improvements to West Tyvola Road to increase accessibility to the site.

Rodgers Builders was selected as the Construction Manager at Risk (CMAR)  for this project.

 

Mallard Creek Water Reclamation Facility (WRF) & Lee S. Dukes Water Treatment Plant (WTP) Standby Power & Electrical Improvements – Cancelled

The first project site is the Mallard Creek Water Reclamation Facility located at 12400 US 29 HWY, Charlotte, North Carolina 28262. The scope of work for this project is a new standby generator facility, the conversion of the existing utility service from 480V to 4160V, electrical upgrades to the existing blower building and the replacement of an existing electrical switchboard. The second project is the Lee S Dukes Water Treatment Plant located at 7980 Babe Stillwell Road, Huntersville, North Carolina 28078. The scope of work for this project is a new standby generator facility, the replacement of the existing 4kV switchgear and 4kV electrical duct bank to re-feed the existing transformers.

State St. Ped Improvement

This project will provide new sidewalk, curb and gutter, drainage improvements, landscaping with Street trees, street resurfacing, and traffic calming bulb outs with small maturing trees in key locations.The project length is 0.468 Miles.