Charlotte Water (CLTWater) will extend drinking water pipes along Dixie River road from 5900 block of Dixie River Rd to Sadler Road. Construction is scheduled to start in early 2022 and will be complete by early 2023.
FY22 Large Diameter Water/Sewer Service Contract 1 and 2
This contract will incorporate the installation of new commercial water/sewer services, dismantlement of existing water/sewer services, installation of short public water/sewer main extensions and the option to install small residential services and water quality sampling stations.
Lakeview Road Improvements
This project spans approximately 1.5 miles and will add transportation capacity along Lakeview Road from Cushing Drive to Old Statesville Road to accommodate the additional traffic expected as a result of the construction of NCDOT’s I-77 Lakeview Road Direct Connect Interchange project. Improvements under this project will include pavement upgrades, intersection modifications, additional through/turning lanes, upgrading drainage infrastructure, and pedestrian and bicycle facilities.
Collective Series J Storm Drain Improvement Project
N. Tryon St- 36th St. Streetscape
The project will provide infrastructure improvements that include sidewalk, curb and gutter, milling- resurfacing, pedestrian refuge and signals, cross walks, planting strips, street trees, pedestrian and street lighting, bike lanes, and on-street parking. The project will provide 0.4 miles of streetscape along 36th street between North Tryon Street and Davidson Street. The project will tie into the Blue Line Extension project on 36th street.
Specialized Roadway Construction Services FY22D
This unspecified contract will provide horizontal construction services on an as-needed basis to the Engineering Department. The work includes traffic control, erosion control, clearing and grading, drainage, milling, asphalt paving, pavement markings, retaining wall, concrete curb, sidewalk, driveways, pedestrian refuge island and wheelchair ramps, utility relocation and installations.
Specialized Roadway Construction FY22C
This unspecified contract will provide horizontal construction services on an as-needed basis to the Engineering Department. The work includes traffic control, erosion control, clearing and grading, drainage, milling, asphalt paving, pavement markings, retaining wall, concrete curb, sidewalk, driveways, pedestrian refuge island and wheelchair ramps, utility relocation and installations.
Specialized Roadway Construction Services FY22A
This unspecified contract will provide horizontal construction services on an as-needed basis to the Engineering Department. The work includes traffic control, erosion control, clearing and grading, drainage, milling, asphalt paving, pavement markings, retaining wall, concrete curb, sidewalk, driveways, pedestrian refuge island, and wheelchair ramps.
I-277 Rail Trail Bridge – Construction
This project will construct a pedestrian bridge over I-277 to connect South End to Uptown. The bridge will be located just west of the existing light rail bridge and will include aesthetic elements to create a signature design. It will also include a new pedestrian rail crossing on the Morehead landing area and will tie the Stonewall plaza into the existing light rail platform. The scope includes a new two-span cable stay arch bridge over I-277. The construction work includes grading, storm drainage, retaining walls, abutments, pedestrian bridge, lighting, curb, and concrete multi-use path.