Queens Road West Water Pipe Replacement Project

Charlotte Water (CLTWater) is planning to replace water services on Queens Road West between East Boulevard and Selwyn Avenue and water pipes under Queens Road West from Wellesley Avenue to Selwyn Avenue and East Boulevard near Queens Road West. The Queens Water Main Replacement Project’s completed design and construction have not been scheduled yet.

Dixie River Road Watermain

Charlotte Water (CLTWater) will extend drinking water pipes along Dixie River road from 5900 block of Dixie River Rd to Sadler Road. Construction is scheduled to start in early 2022 and will be complete by early 2023.

FY22 Large Diameter Water/Sewer Service Contract 1 and 2

This contract will incorporate the installation of new commercial water/sewer services, dismantlement of existing water/sewer services, installation of short public water/sewer main extensions and the option to install small residential services and water quality sampling stations.

Lakeview Road Improvements

This project spans approximately 1.5 miles and will add transportation capacity along Lakeview Road from Cushing Drive to Old Statesville Road to accommodate the additional traffic expected as a result of the construction of NCDOT’s I-77 Lakeview Road Direct Connect Interchange project. Improvements under this project will include pavement upgrades, intersection modifications, additional through/turning lanes, upgrading drainage infrastructure, and pedestrian and bicycle facilities.

Collective Series J Storm Drain Improvement Project

The Collective Storm Drainage Improvement Project (SDIP) Series J contains three separate projects which vary in size and each bring their unique differences. The work involves various storm drainage improvements including replacement of storm drainage pipes, culvert, masonry drainage structures, water line, sewer line, asphalt pavement, concrete driveways, concrete sidewalk and concrete curb. These improvements will realign storm drainage to reduce structure flooding and address failing infrastructure. Due to the complexity of these projects and their proximity to utility poles/structures/retaining walls, active shoring will be required.

N. Tryon St- 36th St. Streetscape

The project will provide infrastructure improvements that include sidewalk, curb and gutter, milling- resurfacing, pedestrian refuge and signals, cross walks, planting strips, street trees, pedestrian and street lighting, bike lanes, and on-street parking. The project will provide 0.4 miles of streetscape along 36th street between North Tryon Street and Davidson Street. The project will tie into the Blue Line Extension project on 36th street.

Specialized Roadway Construction Services FY22D

This unspecified contract will provide horizontal construction services on an as-needed basis to the Engineering Department. The work includes traffic control, erosion control, clearing and grading, drainage, milling, asphalt paving, pavement markings, retaining wall, concrete curb, sidewalk, driveways, pedestrian refuge island and wheelchair ramps, utility relocation and installations.

Specialized Roadway Construction FY22C

This unspecified contract will provide horizontal construction services on an as-needed basis to the Engineering Department. The work includes traffic control, erosion control, clearing and grading, drainage, milling, asphalt paving, pavement markings, retaining wall, concrete curb, sidewalk, driveways, pedestrian refuge island and wheelchair ramps, utility relocation and installations.

Specialized Roadway Construction Services FY22A

This unspecified contract will provide horizontal construction services on an as-needed basis to the Engineering Department. The work includes traffic control, erosion control, clearing and grading, drainage, milling, asphalt paving, pavement markings, retaining wall, concrete curb, sidewalk, driveways, pedestrian refuge island, and wheelchair ramps.