The project proposes to widen Prosperity Church Rd approximately 0.3 mi between Old Ridge Rd and Benfield Rd to provide curb and gutter, sidewalk, storm drainage, bicycle lanes, and on-street parking, as well as a roundabout at Prosperity Church Rd and Prosperity Ridge Rd.
FY23 Large Diameter/Sewer Service Contract #1 (Re-bid)
This contract will incorporate the installation of water and/or sanitary sewer services at a single address, water and/or sanitary sewer service dismantlement at a single address or a water/sanitary sewer main line extension. There maybe more than one water and/or sanitary sewer service installation , water and/or sanitary sewer service dismantlement at the same address. Additionally, a single commercial site with water and/or sanitary sewer services to be installed or water and/or sanitary sewer services to be dismantled at different addresses is to be considered one project for the entire commercial site.
Stowe Regional WRRF Northern Access Road
The Project is for the construction of a new access road to the Long Creek Pump Station and the proposed Stowe Regional Water Resource Recovery Facility (WRRF). The Northern Access Road consists of approximately 5,500 linear feet of paved open-shoulder roadway with 2-12 feet travel lanes and a dual 8’x7’ reinforced concrete box culvert carrying Long Creek Tributary #1 to its confluence with Long Creek.
FY23 Large Diameter/Sewer Service Contract #1
This contract will incorporate the installation of water and/or sanitary sewer services at a single address, water and/or sanitary sewer service dismantlement at a single address or a water/sanitary sewer main line extension. There maybe more than one water and/or sanitary sewer service installation , water and/or sanitary sewer service dismantlement at the same address. Additionally, a single commercial site with water and/or sanitary sewer services to be installed or water and/or sanitary sewer services to be dismantled at different addresses is to be considered one project for the entire commercial site.
Storm Water Repair and Improvement FY2023-C
Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve: mobilization, earthwork, drainage structures, storm drain pipe systems, and channels. Additional work will include: working over, under, near, and around existing private utilities, asphalt paving concrete flatwork, landscaping, and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within the street right-of-way.
Brown Grier Road Upgrades
This project will widen the two-lane road to a four-lane median-divided road with multi-use paths between Steele Creek Road and Whitehall Park Drive, and a multi-use path north along Sandy Porter Road to the subdivision at Williams Glenn Road.
Beatties Ford Rd (LaSalle- Oaklawn) Sidewalks Ph. 1
This project will add sidewalks and amenities along Beatties Ford Rd between LaSalle St and Oaklawn Ave.
Morris Field Bridge Replacement
This project will replace the bridge on Morris Field Drive between Wilkinson Boulevard and Golf Acres Drive, over the Norfolk Southern Railroad.
I-85 North Bridge (Rebid)
This project will construct a bridge over I-85 to directly connect Doug Mayes Place and Louis Rose Place. This will relieve congestion at the WT Harris Blvd/ I-85 and Mallard Creek Church Rd/ I-85 interchanges.