Rea Road Widening (I-485 to Williams Pond Lane)

The purpose of this project is to increase capacity along Rea Road. Capacity will be increased by utilizing the right turn lane drops and median to develop an additional NB and SB through lane along Rea Road between the I-485 ramps and Williams Pond Lane. This project will also result in increased turn lane capacity and intersection improvements at Piper Station Drive and Ballantyne Commons Parkway. Pedestrian safety and mobility will be improved by providing sidewalks on both sides of Rea Road. Other specific improvements include: curb and gutter, accessible ramps, and driveways.

7th Street Parallel Bike Routes

This project will build bike facilities in several different locations throughout the Elizabeth neighborhood to create safer conditions and improve ease of travel for cyclists and pedestrians, including approximately 2.1 miles of sharrows, modernization of two existing rectangular rapid flashing beacons, replacement of 10 wheelchair ramps, a new pedestrian crossing at Pecan Avenue and Shenandoah Avenue, implementation of new bike detection cameras, a new full traffic signal at Bascom Street and 7th Street, and a curb extension located at the intersection of Pecan Avenue and 8th Street.

Remount Road and West Boulevard Intersection Improvements

The project consists of intersection improvements at Remount Rd and West Blvd including sidewalks, curb and gutter, decorative concrete surface treatments, bus shelters with amenities, pedestrian-scale lighting, crosswalks, curb ramps, pedestrian crossing signalization, and landscaping.

Sharon Road at Eastburn Road Improvements

This project is located on Sharon Road at Eastburn Road. The project proposes a curve realignment adding a left-turn lane from Sharon Road on to Eastburn Road and removing the superelevation.

CMAR Services – Ashley Road/Tuckaseegee Road & Freedom Drive Intersection

The project area includes the intersection area and approaches for Ashley Road/Tuckaseegee Road (State Road 1662), and Freedom Drive (NC Highway 27). Currently, the area lacks adequate pedestrian and bicycle infrastructure, limiting safe mobility and access to key destinations such as the Mecklenburg County Valerie C. Woodard Community Resource Center.

CMAR Services – Cross Charlotte Trail (XCLT) Matheson to Craighead

The Matheson to Craighead segment of the Cross Charlotte Trail will implement a 14-foot shared use path beginning at E 36th Street. The path will continue down Cullman Ave and board walk up into a pedestrian bridge spanning the Norfolk Southern Railroad tracks utilizing a prefabricated structure within railroad right of way. The structure will then connect to the existing trail built by Brand Properties within the Kaleido Noda apartment complex.

Cross Charlotte Trail (XCLT)− Matheson to Craighead (REVISED 7/2025)

The Matheson to Craighead segment of the Cross Charlotte Trail will implement a 14-foot shared use path beginning at E 36th Street. The path will continue down Cullman Ave and board walk up into a pedestrian bridge spanning the Norfolk Southern Railroad tracks utilizing a prefabricated structure within railroad right of way. The structure will then connect to the existing trail built by Brand Properties within the Kaleido Noda apartment complex.

July 2025 Update: This project will not go out for public bid; it is now being designed and constructed through a reimbursement agreement with a private developer