Monroe Road Multi Use Path (MUP)

The purpose of this project is to provide safer pedestrian conditions along Monroe Road from Eaton Road to McCullen Way. Currently, there are two active city projects in the vicinity of this project. This MUP will fill a key gap between these two projects, providing a safer and more connected route for pedestrians and cyclists.

Shamrock Drive Complete Street

Project limits are from Beckwith Place to Flamingo Ave (0.9 miles). Project includes new turn lanes, sidewalks, painted buffered bike lanes, two roundabouts, wheelchair ramps, ped medians, driveways, curb and gutter, storm drainage, street trees, public art and pedestrian crossings.

Central Kilborne Norland Intersection & Street Upgrade

Limits are from Woodland Dr. to just south of Havenwood Rd. / Kilborne Dr. intersection (.87 miles). The project includes a new urban greenspace named Potter Place (including public art), separated bike lanes, protected intersection improvements at Central Ave., wayfinding, storm drainage, street trees, and pedestrian medians.

Beatties Ford Rd. Sunset Pedestrian Improvements Phase 1

This project will improve the pedestrian and bicycle facilities on Sunset Road from Day Lilly Lane to Beatties Ford Road. Project length is approximately 2.12 miles. The work includes construction of concrete sidewalk, curb & gutter, curb ramps and driveways, drainage, grading, erosion control, traffic control, asphalt pavement, pavement markings and water & sanitary sewer improvements.

Prosperity Church Road (Old Ridge to Benfield) Improvements

The project proposes to widen Prosperity Church Rd approximately 0.3 mi between Old Ridge Rd and Benfield Rd to provide curb and gutter, sidewalk, storm drainage, bicycle lanes, and on-street parking, as well as a roundabout at Prosperity Church Rd and Prosperity Ridge Rd.

FY23 Large Diameter/Sewer Service Contract #1 (Re-bid)

This contract will incorporate the installation of water and/or sanitary sewer services at a single address, water and/or sanitary sewer service dismantlement at a single address or a water/sanitary sewer main line extension. There maybe more than one water and/or sanitary sewer service installation , water and/or sanitary sewer service dismantlement at the same address. Additionally, a single commercial site with water and/or sanitary sewer services to be installed or water and/or sanitary sewer services to be dismantled at different addresses is to be considered one project for the entire commercial site.

Stowe Regional WRRF Northern Access Road

The Project is for the construction of a new access road to the Long Creek Pump Station and the proposed Stowe Regional Water Resource Recovery Facility (WRRF).  The Northern Access Road consists of approximately 5,500 linear feet of paved open-shoulder roadway with 2-12 feet travel lanes and a dual 8’x7’ reinforced concrete box culvert carrying Long Creek Tributary #1 to its confluence with Long Creek.

FY23 Large Diameter/Sewer Service Contract #1

This contract will incorporate the installation of water and/or sanitary sewer services at a single address, water and/or sanitary sewer service dismantlement at a single address or a water/sanitary sewer main line extension. There maybe more than one water and/or sanitary sewer service installation , water and/or sanitary sewer service dismantlement at the same address. Additionally, a single commercial site with water and/or sanitary sewer services to be installed or water and/or sanitary sewer services to be dismantled at different addresses is to be considered one project for the entire commercial site.

 

Storm Water Repair and Improvement FY2023-C

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve: mobilization, earthwork, drainage structures,  storm drain pipe systems, and channels.   Additional work will include: working over, under, near, and around existing private utilities, asphalt paving concrete flatwork, landscaping, and any associated work required by the Engineer.  Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments).  Storm Water maintenance work may be located entirely within the street right-of-way.