This bid package is a collection of projects to increase potable water system reliability and replace aging infrastructure. Work consists of approximately 15,000 linear feet of potable water line construction for 2, 6, 8-inch pipe, and associated repair or replacement of asphalt pavement, concrete sidewalk, curb ramps, curb & gutter, and minor lawn/landscape restoration, primarily within CDOT and NCDOT right-of-way.
Cancelled as of 10/21/2024
This bid package is a collection of projects to increase potable water system reliability and replace aging infrastructure. Work consists of approximately 15,000 linear feet of potable water line construction for 2-, 6-, and 8-inch pipe, and associated repair or replacement of asphalt pavement, concrete sidewalk, curb ramps, curb & gutter, and minor lawn/landscape restoration, primarily within CDOT and NCDOT right-of-way.
this opportunity was archived earlier
This project includes stream stabilization and sewer repair at multiple locations within the sanitary sewer collection system. Stream stabilization structures shall be constructed to protect existing and proposed sanitary sewer infrastructure.
Project components include natural in-stream structures, plantings, site grading, sanitary sewer replacement, sheet pile installation, bypass pumping and sediment control measures. Site locations will be released during the contract duration.
The contract is expected to be for a two-year term with possible renewal.
This project includes the removal of two high-density polyethene chemical storage tanks and mixers, the construction of a new chemical storage tank containment area, the installation of three new chemical storage tanks (two in the existing containment area and one in the new containment area), installation of a chemical mixer at each tank, installation of a new chemical metering pump in the new containment area, construction of an enclosed pump room within the containment areas, installation of new and replacement of piping, and construction of a canopy over the new containment area.
This project consists of the sanitary sewer rehabilitation of approximately 13,500 linear feet of sewer outfall with cured-in-place lining. This project will extend along the Briar Creek and Paw Creek outfalls. A 112 linear feet 24-inch diversion sewer will also be constructed under Briar Creek along with a 118 linear feet 8-inch linear feet collector sewer.
Project site is mainly wooded and has minimal housing. There will be one crossing on Lawyers Rd. The project will consist of approximately 5,500 linear feet of 8-inch gravity sewer.
This project will install single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. It will remove existing copper communication cables. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.
This project will install single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. It will remove and replace existing copper and fiber communication cables. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.