Ashe Plantation Lift Station

This contract will be for the construction of a 250,000 gallon-per-day duplex lift station and demolition of the existing wastewater treatment package plant. Included will be the construction of an emergency containment basin, upsizing of an existing gravity sewer, installation of a portion of an 8″ force main, new wet well. Owner plans to procure pumps and standby generator for the project.

Lift Station Improvements Phase III

This construction contract is for various improvements and rehabilitation needs at six of our lift station sites. General improvements will include reck-mounted control cabinets at grade level, new submersible pressure transducers, new wet well level floats, installation of a magnetic flow meter in a precast vault with a bypass on the existing force main.

Franklin WTP Belt Filter Press Conveyor Replacement

This will be an Invitation to Bid to procure and install a new belt filter press conveyor system at Franklin Water Treatment Plant. The work will also include demolition and removal of the existing system.

FY26 Water and Sewer Infrastructure

These contract(s) will be for the on-call consulting services of internal projects under the guidance of Design and Construction for miscellaneous needs, such as water and sewer extension projects and other capital projects. These contracts will cover Charlotte Water’s entire service area.

Sugar Creek WWTP East Equalization Basin Joint Repair

This contract will be for the rehabilitation of the east equalization basin. Construction will require the removal and replacement of deteriorating joint materials. This project will also include high pressure crack injection repairs.

McDowell Creek WRRF Primary Clarifier Mechanism Replacement-CANCELLED

The project involves the procurement of a new primary clarifier mechanism to replace the existing mechanism in Primary Clarifier #5 at the McDowell Creek Water Resource Recovery Facility. This replacement aims to improve the performance and reliability of the primary clarifier, ensuring that it meets current operational standards.

Duplicate entry of McDowell Creek WRRF Clarifier Mechanism, cancelled 11/14

Service Water Improvements and Flow Meter Modifications

This project includes significant improvements to the existing service water system at the Franklin Water Treatment Plant. The scope of work involves the replacement of existing pumps, piping, valves, and backflow devices within the service water system. Additionally, new flow meters will be installed on the Franklin Water Treatment Plant service water system, while existing flow meters on the filter effluent lines at the Lee S. Dukes Water Treatment Plant will also be replaced. These upgrades are expected to enhance the accuracy of flow measurements and improve the efficiency of the service water system.

McDowell Creek WRRF Primary Clarifier Rehabilitation

This project will rehabilitate Primary Clarifier #5 at the McDowell Creek Water Resource Recovery Facility. The scope of work includes the demolition and replacement of the existing clarifier mechanism, various concrete repairs, and regrouting of the clarifier floor. Additionally, pressure-reducing valves, plug valves, and telescoping valves will be replaced, and existing electrical and instrumentation systems will be reconnected to the new clarifier mechanism. These improvements will enhance the functionality and durability of the primary clarifier.