Charlotte Douglas International Airport is establishing an Multi Year Asphalt Maintenance Program. This program will include asphalt replacement and repair maintenance services at various locations as needed for property and facilities managed by the Aviation Department. Task Orders will be issued with details concerning the services to be provided.
Overflow Lots 1 & 2 Asphalt Patching (Construction)
This project will consist of Asphalt Patching in Overflow Parking for Lots 1 & 2.:
1. Approximately 7,500 square feet of asphalt patching at 2” depth per NCDOT Standards
2. Approximately 3,200 square feet of asphalt patching at 10.5” depth per standard below.
Compact 6” ABC stone will be included, as needed, estimated at 100 tons.
These areas will be identified/confirmed on site prior to commencement of work. Parking lots will be empty and clear of vehicles during this work.
Backlot Trail
This project will install a 10-foot asphalt path that connects Park South Drive to Park Road. This will include two pedestrian signals.
DeArmon Road Improvements Project
The DeArmon Road Improvements Project is part of the City of Charlotte’s Prosperity Village Comprehensive Neighborhood Improvement Program. The project will complete the infrastructure needs in the neighborhood by providing buffered bicycle lanes, median/turning lane, storm drainage, curb & gutter, sidewalk and a greenway passage beneath DeArmon Road for the future extension of Clark’s Creek Greenway.
Kilborne Drive Streetscape
This project will improve Kilborne Drive from the Eastway Drive intersection to just South of Havenwood Road. Improvements include painted buffered bike lanes, sidewalk, ped crossing medians, traffic calming and street trees. Project connects to the Central/Kilborne/Norland project South of Havenwood Road. (Project length= 0.9 miles)
Asphalt Taxiway & Runway Improvements (Construction)
This project is related to on-going maintenance and repair project for asphalt pavement around the Airport’s Airfield, including runways and taxiways. The typical scope of work involves milling and resurfacing heavily-used areas of runways and taxiways, which will usually involve working during night-time hours, in order to minimize impacts to Airport Operations,