Sharon Road at Eastburn Road Improvements

This project is located on Sharon Road at Eastburn Road. The project proposes a curve realignment adding a left-turn lane from Sharon Road on to Eastburn Road and removing the superelevation.

Josh Birmingham Parkway Cell Lot and Bypass

The Josh Birmingham Parkway Cell Lot and Bypass project includes the addition of a commercial vehicle road bypass near Gate 80 that connects the existing Airport Beacon Ln and the lower commercial vehicle entrance at the Charlotte Douglas International Airport (CLT) terminal.  This project will also include a full auxiliary lane along Josh Birmingham Parkway that spans from the Cell Phone Lot and Long Term 1 Bus Exit to the entrance of the Cell Phone Lot.  This project includes erosion and sedimentation control, grading, drainage, construction of curb and gutter, landscaping, asphalt paving, utilities, construction of a modular precast block wall, traffic control, relocation of light and banner poles, fencing, and signage.

PCC Spall Repair Program

The Airfield Maintenance Department of the Facilities Division of CLT maintains hard surface areas of the airfield, tenant and CLT parking areas, and private roadways on CLT property. The intent of this solicitation is to select a company to provide repairs utilizing selected construction materials for specific projects at various locations on airport property on an as needed basis during the duration of the scheduled contract. The Scope of Services requires the contractor to furnish all supervision, labor, materials, machinery, tools, equipment, and services, and perform and complete all work in an efficient and workmanlike manner necessary to complete construction of the PCC Spall Repair Program

Secondary PCC Spall Repair Program

The Airfield Maintenance Department of the Facilities Division of CLT maintains hard surface areas of CLT’s airfield, and other areas as-needed. The intent of this solicitation is to select a company to provide repairs utilizing selected construction materials for specific projects at various locations on airport property on an as needed basis during the duration of the scheduled contract. The Scope of Services requires the contractor to furnish all supervision, labor, materials, machinery, tools, equipment, and services, and perform and complete all work in an efficient and workmanlike manner necessary to complete construction of the PCC Spall Repair Program.

Asphalt Multi Year Pavement Program

Charlotte Douglas International Airport is establishing an Multi Year Asphalt Maintenance Program. This program will include asphalt replacement and repair maintenance services at various locations as needed for property and facilities managed by the Aviation Department. Task Orders will be issued with details concerning the services to be provided.

Overflow Lots 1 & 2 Asphalt Patching (Construction)

This project will consist of Asphalt Patching in Overflow Parking for Lots 1 & 2.:

1. Approximately 7,500 square feet of asphalt patching at 2” depth per NCDOT Standards
2. Approximately 3,200 square feet of asphalt patching at 10.5” depth per standard below.

Compact 6” ABC stone will be included, as needed, estimated at 100 tons.

These areas will be identified/confirmed on site prior to commencement of work.  Parking lots will be empty and clear of vehicles during this work.

Backlot Trail

This project will install a 10-foot asphalt path that connects Park South Drive to Park Road. This will include two pedestrian signals.

DeArmon Road Improvements Project

The DeArmon Road Improvements Project is part of the City of Charlotte’s Prosperity Village Comprehensive Neighborhood Improvement Program.  The project will complete the infrastructure needs in the neighborhood by providing buffered bicycle lanes, median/turning lane, storm drainage, curb & gutter, sidewalk and a greenway passage beneath DeArmon Road for the future extension of Clark’s Creek Greenway.

Kilborne Drive Streetscape

This project will improve Kilborne Drive from the Eastway Drive intersection to just South of Havenwood Road. Improvements include painted buffered bike lanes, sidewalk, ped crossing medians, traffic calming and street trees. Project connects to the Central/Kilborne/Norland project South of Havenwood Road. (Project length= 0.9 miles)