This project will address the non-conforming, physical ADA barriers to the greatest extent feasible and where applicable under code provisions. Phase 1 addresses barriers in the Charlotte Mecklenburg Government Center Chamber Space. Scope includes the following, but is not limited to, Doors and Door Hardware, Ramps, Seating, Millwork, Speaker Podiums, Media Pit, Dias Access and Entry Vestibule Controlled Access.
Old City Hall – ADA Implementation
This solicitation will be used for addressing the physical barriers identified in the city’s ADA Transition Plan. Areas include but are not limited to; restrooms, water fountains, signage, handrails/guardrails, doors & hardware, main lobby service area, exterior sidewalks, parking, and striping.
McAlpine Creek WWTP Administration Renovations–CANCELLED
The project includes, but is not limited to, the renovation of the second floor of the McAlpine Creek WWMF Administration Building and the replacement of HVAC equipment on both floors and outside of the building. Work includes partial demolition of existing facilities to renovate two laboratories, upgrade restroom facilities, convert nonfunctioning lab space into office space, upgrade currently operating lab space, and replace non-functioning HVAC system and associated appurtenances.
Sweden Road Concrete and Asphalt Pavement Project Phase 2
This project will install new concrete and asphalt pavement improvements at the Fleet Management Sweden Road shop.
Pleasant Grove Road Sidewalk- Cancelled
This project will construct sidewalk along the south side of Pleasant Grove Road from Hipp Road to Oakdale Elementary School. This project has been cancelled.
Shade Valley Realignment Project
Construction of a roundabout at the Shade Valley Road/ Oakhurst Commons Drive intersection and installing a 10 to 12 ft. concrete multi-use path along Monroe Road. Amenities include: sidewalk curb & gutter, planting strips, accessible ramps truck apron, pedestrian refuge islands, and a sand filter stormwater detention pond.
Sharon Road Sidewalk CANCELLED
This project will install sidewalk along the west side of Sharon Road from Bramwyck Drive to Chandworth Road.
Matheson Avenue Bridge Streetscape
This project will incorporate pedestrian, bicycle and bridge improvements on Matheson Avenue from North Tryon Street to Jordan Place. The project will include a westbound one-way bicycle path along the north side of Matheson Avenue and a two- way bicycle path and sidewalk along the south side. Both sides will include a three-foot buffer between the bicycle paths and the road.
Copy of 16th Street Streetscape Phase 2
This project is the second phase of 16th Street Streetscape project. Streetscape improvements include concrete sidewalk and ramps, curb and gutter, storm drainage, erosion control, slope grading work, and installation of a soil nail retaining wall on 16th Street adjacent to the Norfolk Southern parcel, at the northeast corner of N. Tryon Street and 16th Street intersection.