Vest Water Treatment Plant Concrete Repairs

The Project consists of concrete repairs and coating applications in the south filter gallery gullets and south sedimentation basin flumes. Improvements to the flocculation basin effluent flumes, including installation of a concrete bulkhead and stop plates. Additional work includes hatch installations, miscellaneous concrete repairs throughout the facility, and miscellaneous small diameter pipe replacement.

Zone 1 HVAC Rehabilitation (CANCELLED)

This project will be adding freeze protection to the two warehouse spaces that are approximately 30,000 square feet.  The space currently has no permanent means of heat.   The completed project will include several space heaters, piping, and electrical controls.  This will also include a storage pad and outdoor bulk propane tank which will fuel the heaters.

Lee S. Dukes Water Treatment Plant (WTP) Miscellaneous Chemical Feed Improvement Project

The project consists of installation of 6,000 LF of new 3-inch x 6-inch diameter double wall containment pipe for new chlorine dioxide chemical feed system, including all appurtenances, leak detection system, electrical, testing, and final commissioning.  Installation of two (2) new 2-inch diameter HDPE raw water sample lines (approximate length is 6,000 LF for each), including all appurtenances, and testing. Installation of a new raw water sample pump, casing, piping, appurtenances, electrical, and testing at the Raw Water Intake at Blythe Landing.  Removal and replacement of various chemical feed lines (11/2-inch and 4-inch diameter) inside existing 8-inch and 12-inch diameter casing pipes. Installation of new fiber optic cable (approximately 6,000 LF) between the Lee S. Dukes WTP and the Raw Water Intake. Installation of new potable water line from Highway 73 to existing Compressor Building, including all appurtenances, and testing.

McAlpine Biosolids Improvements-CANCELLED

This project involves the rehabilitation of Biosolids Facilities and Processes which includes the dewatering facility, digester complexes, and digesters. Major mechanical process work and electrical upgrades will also be completed.

Cancelled as of 10/22/2024

McAlpine Biosolids Improvements – cancelled

This project involves the rehabilitation of Biosolids Facilities and Processes which includes the dewatering facility, digester complexes, and digesters. Major mechanical process work and electrical upgrades will also be completed.

this opportunity was archived earlier

DELETE – Construction of Phase II of the Ashe Plantation Wastewater Treatment Plant

Two customers submitted this project under slightly different titles.  This entry is redundant of the “Ashe Plantation Phase II” project.  Please delete this one.

 

Construction of a new wastewater treatment plant in South Mecklenburg County near Mint Hill.  The construction consists of process piping, wastewater equipment installation, and electrical power and controls.  The project shall also include provision of a temporary treatment plant during construction of the new plant.

Stowe Regional Water Resource Recovery Facility Southern Access Roads

The Project is for the construction of an extension of the existing access road at the Long Creek Pump Station for operational connectivity between the proposed Stowe Regional Water Resource Recovery Facility (WRRF) and Long Creek Pump Station (Southern Access Road). The Southern Access Road consists of approximately 650 linear feet of paved roadway with 2-12 feet travel lanes and a three span approximately 235 feet long bridge that accommodates the two travel lanes and a pedestrian/utility corridor lane over Long Creek.

McAlpine Low Lift Pump Station Improvements

This project consists of the replacement of low lift station pump check valves. The project will also include filter improvements and non-potable water upgrades, electrical updates, and a sluice gate replacement.