Fiscal Year 2026 Street Main Extensions Contract 2

This contract will include the construction of street main extensions and various infrastructure projects. The contract will provide construction assistance for other capital projects as needed. It covers the entire Charlotte Water service area, ensuring water distribution system improvements.

Fiscal Year 2026 Street Main Extensions Contract 1

This contract includes the construction of multiple street main extensions and other miscellaneous infrastructure projects. It will provide construction assistance on an as-needed basis for other capital projects. The scope covers the entire Charlotte Water service area, ensuring water distribution system improvements where necessary.

McAlpine Wastewater Management Facility Preliminary and Primary Treatment Facilities Rehabilitation

The project includes mechanical, electrical, instrumentation, and structural rehabilitation of preliminary and primary treatment facilities at the McAlpine Creek WWMF. The facilities generally include Screenings Removal, Primary Clarifiers, Gravity Thickeners, Flow Equalization Storage, Flow Equalization Pumping, and Chemical Storage. These improvements will enhance operational reliability and efficiency.

Unspecified Time and Materials Water & Sewer Repairs

The project consists of providing equipment, vehicles, machinery, implements, tools, supplies, incidentals, and skilled personnel to complete unspecified extensions, modifications, maintenance, and repairs to the existing water and
sewer system in the Charlotte Water service area.

McDowell Creek WRRF Primary Clarifier Mechanism Replacement-CANCELLED

The project involves the procurement of a new primary clarifier mechanism to replace the existing mechanism in Primary Clarifier #5 at the McDowell Creek Water Resource Recovery Facility. This replacement aims to improve the performance and reliability of the primary clarifier, ensuring that it meets current operational standards.

Duplicate entry of McDowell Creek WRRF Clarifier Mechanism, cancelled 11/14

Service Water Improvements and Flow Meter Modifications

This project includes significant improvements to the existing service water system at the Franklin Water Treatment Plant. The scope of work involves the replacement of existing pumps, piping, valves, and backflow devices within the service water system. Additionally, new flow meters will be installed on the Franklin Water Treatment Plant service water system, while existing flow meters on the filter effluent lines at the Lee S. Dukes Water Treatment Plant will also be replaced. These upgrades are expected to enhance the accuracy of flow measurements and improve the efficiency of the service water system.

McDowell Creek WRRF Primary Clarifier Rehabilitation

This project will rehabilitate Primary Clarifier #5 at the McDowell Creek Water Resource Recovery Facility. The scope of work includes the demolition and replacement of the existing clarifier mechanism, various concrete repairs, and regrouting of the clarifier floor. Additionally, pressure-reducing valves, plug valves, and telescoping valves will be replaced, and existing electrical and instrumentation systems will be reconnected to the new clarifier mechanism. These improvements will enhance the functionality and durability of the primary clarifier.