Fiscal Year 2024 Water/Sewer infrastructure Construction – Contract 1

This contract will consist of an undetermined number of individual projects consisting of water and/or sewer extensions, water and/or sewer replacements, low-pressure sanitary sewer, water distribution system reliability improvement projects, and/or sanitary sewer capacity assurance projects, which will be assigned by the Project Engineer.

McAlpine Creek WWTP Administration Renovations–CANCELLED

The project includes, but is not limited to, the renovation of the second floor of the McAlpine Creek WWMF Administration Building and the replacement of HVAC equipment on both floors and outside of the building. Work includes partial demolition of existing facilities to renovate two laboratories, upgrade restroom facilities, convert nonfunctioning lab space into office space, upgrade currently operating lab space, and replace non-functioning HVAC system and associated appurtenances.

Water and Sewer Service Dismantlements

Charlotte Water will be advertising a construction Invitation to Bid for a new Water and Sewer Dismantlement Contract. This contract will provide dismantlement of existing water and sewer services as they are requested by customers.

FY24 Small Diameter Water/Sewer Service Contract #1

This contract is for water and sanitary sewer service installations, including connection to the existing public main, which extends a small diameter line to the property, and includes a water meter box or sanitary sewer clean out. Customers pay connection fees for the installation service, which is based on costs incurred by Charlotte Water in these contracts. The work covered by this contract will provide approximately 900 total services.

McAlpine Wastewater Treatment Plant Dewatering Building HVAC Replacement

Replacing the McAlpine Waste Water Treatment Plant Dewatering Building HVAC system including all associated mechanical equipment, electrical, I&C, and ancillary components.

This project includes the HVAC upgrades at McAlpine Creek WWTP Thickening/Dewatering Building. The upgrades would include the replacement of air handling units, make up air units, exhaust fans, ductworks, the addition of split AC units, and the addition of an alarm and monitoring system for HVAC equipment. The scope will also include some structural and architectural rehabilitation needed to accommodate new ductwork and HVAC equipment.

Sugar Creek Wastewater Treatment Plant Alkalinity Storage Replacement

This project includes the removal of two high-density polyethene chemical storage tanks and mixers, the construction of a new chemical storage tank containment area, the installation of three new chemical storage tanks (two in the existing containment area and one in the new containment area), installation of a chemical mixer at each tank, installation of a new chemical metering pump in the new containment area, construction of an enclosed pump room within the containment areas, installation of new and replacement of piping, and construction of a canopy over the new containment area.

 

Briar Creek and Paw Creek Sewer Rehabilitation

This project consists of the sanitary sewer rehabilitation of approximately 13,500 linear feet of sewer outfall with cured-in-place lining. This project will extend along the Briar Creek and Paw Creek outfalls.  A 112 linear feet 24-inch diversion sewer will also be constructed under Briar Creek along with a 118 linear feet 8-inch linear feet collector sewer.

FY23 Small Diameter Water/Sewer Service Contract #2 (Re-bid)

This contract is for water and sanitary sewer service installations including connection to the existing public main, which extends a small diameter line to the property.  Additionally, a water meter box or sanitary sewer cleanout is included. Customers pay connection fees for the installation service, which is based on costs incurred by Charlotte Water in these contracts. The work covered by this contract will provide approximately 800 total services.