The DeArmon Road Improvements Project is part of the City of Charlotte’s Prosperity Village Comprehensive Neighborhood Improvement Program. The project will complete the infrastructure needs in the neighborhood by providing buffered bicycle lanes, median/turning lane, storm drainage, curb & gutter, sidewalk and a greenway passage beneath DeArmon Road for the future extension of Clark’s Creek Greenway.
Sandy Porter S Tryon Intersection Improvements
This project includes pedestrian safety and capacity improvements at the intersection of Sandy Porter and South Tryon Street. The project will add a left turn lane off of South Tryon onto Sandy Porter and install widened sidewalks.
Kilborne Drive Streetscape
This project will improve Kilborne Drive from the Eastway Drive intersection to just South of Havenwood Road. Improvements include painted buffered bike lanes, sidewalk, ped crossing medians, traffic calming and street trees. Project connects to the Central/Kilborne/Norland project South of Havenwood Road. (Project length= 0.9 miles)
Pleasant Grove Road Sidewalk- Cancelled
This project will construct sidewalk along the south side of Pleasant Grove Road from Hipp Road to Oakdale Elementary School. This project has been cancelled.
Shade Valley Realignment Project
Construction of a roundabout at the Shade Valley Road/ Oakhurst Commons Drive intersection and installing a 10 to 12 ft. concrete multi-use path along Monroe Road. Amenities include: sidewalk curb & gutter, planting strips, accessible ramps truck apron, pedestrian refuge islands, and a sand filter stormwater detention pond.
Sharon Road Sidewalk CANCELLED
This project will install sidewalk along the west side of Sharon Road from Bramwyck Drive to Chandworth Road.
Matheson Avenue Bridge Streetscape
This project will incorporate pedestrian, bicycle and bridge improvements on Matheson Avenue from North Tryon Street to Jordan Place. The project will include a westbound one-way bicycle path along the north side of Matheson Avenue and a two- way bicycle path and sidewalk along the south side. Both sides will include a three-foot buffer between the bicycle paths and the road.
Copy of 16th Street Streetscape Phase 2
This project is the second phase of 16th Street Streetscape project. Streetscape improvements include concrete sidewalk and ramps, curb and gutter, storm drainage, erosion control, slope grading work, and installation of a soil nail retaining wall on 16th Street adjacent to the Norfolk Southern parcel, at the northeast corner of N. Tryon Street and 16th Street intersection.
Copy of 16th Street Streetscape Phase 2
This project is the second phase of 16th Street Streetscape project. Streetscape improvements include concrete sidewalk and ramps, curb and gutter, storm drainage, erosion control, slope grading work, and installation of a soil nail retaining wall on 16th Street adjacent to the Norfolk Southern parcel, at the northeast corner of N. Tryon Street and 16th Street intersection.