Graham Street Extension Intelligent Transportation Systems

This project will install single‐mode fiber optic cable in existing conduits. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.

Sardis Road Intelligent Transportation System (ITS) – CANCELLED

This project will install single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.

West Boulevard ITS – CANCELLED

This project will install single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.

North Tryon Street Intelligent Transportation System (ITS)

This project will install single‐mode fiber optic cable installed in new directionally bored, hand-dug and trenched conduit, existing conduit, and aerial attachments to poles. It will remove existing copper communication cables. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment, and other related activities.

Sugar Creek Road ITS – CANCELLED

This project will install single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. It will remove existing copper communication cables. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.

Arrowood Road Intelligent Transportation System (ITS)

This project will install single‐mode fiber optic cable installed in new directionally bored, hand-dug, and trenched conduit, existing conduit, and aerial attachments to poles. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment, and other related activities.

Tuckaseegee Roundabout

This project will replace the signalized intersection of Tuckaseegee/Thrift/Berryhill with a roundabout.

Peachtree Hills Sidewalk

This project will install sidewalk within the Peachtree Hills area in three (3) locations. The proposed sidewalk will be located along Peachtree Road from Oakdale Road to Crandon Drive, along the northeast side of Beam Lake Drive from Peachtree Road to an existing sidewalk connection 800ft east, and along the south side of Oak Drive from Oakdale Road to an existing sidewalk connection 0.25 miles east.

Sidewalk Gaps and Ramps

This project will be construct various small sidewalk and ramp improvements throughout the City of Charlotte.