charlotte-department-transportation-bluet  Charlotte Department of Transportation / Construction

North Tryon Street Intelligent Transportation System (ITS)

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon

Posting Number 03 2024-Q1(Jan-Mar)-CDT-4202

Anticipated Posting Date 2024-03-01

Commodity Code(s): 91316, 91347, 91356, 91389

This project will install single‐mode fiber optic cable installed in new directionally bored, hand-dug and trenched conduit, existing conduit, and aerial attachments to poles. It will remove existing copper communication cables. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment, and other related activities.

Requirements

Last Updated: 09/20/24
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Jayne Peterson

City Contact

704-353-1976

japeterson@ci.charlotte.nc.us