Charlotte Department of Transportation / Construction
North Tryon Street Intelligent Transportation System (ITS)
Details
Posting Number 03 2024-Q1(Jan-Mar)-CDT-4202
Anticipated Posting Date 2024-03-01
Commodity Code(s): 91316, 91347, 91356, 91389
This project will install single‐mode fiber optic cable installed in new directionally bored, hand-dug and trenched conduit, existing conduit, and aerial attachments to poles. It will remove existing copper communication cables. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment, and other related activities.
Requirements
Follow This Opportunity!