An extension of McCullough Drive, from it’s current terminus east
of southeast of North Tryon Street, to the disconnected terminus
southwest of W.T. Harris Blvd. It is already designed and real
estate acquired. This is necessary for splitting this project apart
from the McCullough Streetscape Project. Length = 0.272 miles
Sugar Creek WWTP East Equalization Basin Joint Repair
This contract will be for the rehabilitation of the east equalization basin. Construction will require the removal and replacement of deteriorating joint materials. This project will also include high pressure crack injection repairs.
McAlpine Wastewater Management Facility Preliminary and Primary Treatment Facilities Rehabilitation
The project includes mechanical, electrical, instrumentation, and structural rehabilitation of preliminary and primary treatment facilities at the McAlpine Creek WWMF. The facilities generally include Screenings Removal, Primary Clarifiers, Gravity Thickeners, Flow Equalization Storage, Flow Equalization Pumping, and Chemical Storage. These improvements will enhance operational reliability and efficiency.
Unspecified Time and Materials Water & Sewer Repairs
The project consists of providing equipment, vehicles, machinery, implements, tools, supplies, incidentals, and skilled personnel to complete unspecified extensions, modifications, maintenance, and repairs to the existing water and
sewer system in the Charlotte Water service area.
Sugar Creek WWTP Influent Pump Station Electrical Building Settlement Improvements
This contract will be to correct the settlement of the electrical building at the influent pump station. The improvements will require pressure grouting under the existing slab. Installation of micropiles or helical piers will be needed at selected locations.
Mallard Creek Road Shared-Use Path (Governor Hunt to Driwood)
This project will construct a shared-use path along the east side of Mallard Creek Road from Governor Hunt Road to Driwood Court. Specific improvements will also include construction of a plant strip, curb and cutter, accessible ramps, driveways, and potential storm drainage improvements. The purpose of this project is to improve pedestrian safety, mobility, and connectivity along Mallard Creek Road. Project Length = 0.4 miles.
WT Harris SUP (JW Clay to N Tryon)
A 12’ wide shared-use path will be installed along WT Harris Blvd, from JW Clay Blvd to N Tryon St. This includes pedestrian ramps, storm drain services, and new pavement markings in addition to the shared-use path. Project Length = 0.33 miles.
Old Concord Road Shared-Use Path (Meadow Vista to Arlyn Cir)
This project will construct a shared-use path along the west side of Old Concord Road from Meadow Vista Road to Arlyn Circle. Construction of driveway improvements and wheelchair ramps are included in this scope. The construction of the shared-use path will help to improve safety and walking conditions for citizens along this minor thoroughfare. This project will also connect several miles of pedestrian walkways within this area. Old Concord Road Shared-Use Path is considered a high priority project based on CDOT’s sidewalk Priority list and was requested by the residents and business owners in the area. Improvements for Charlotte Water are also included in the project scope. Project Length= .85 miles.
Kuykendall Road Improvements
This project will connect sidewalk along Kuykendall Road from
Thorn Blade Drive to McKee Road, and add a right-turn lane from
Kuykendall Road on to McKee Road in order to to increase
pedestrian safety and help alleviate traffic congestion at the
intersection. Project will also fill in small sidewalk gap on the south
side of McKee Rd at Kuykendall Rd and add pedestrian signals with
crosswalk at this intersection. Project length = approximately 0.75
miles.