The project involves analysis of existing conditions to determine areas suitable for improvement, planning analysis of improvement alternatives, and the design and construction of the needed improvements in the Eastway Storm Drainage Improvement Project (SDIP) area.
The Eastway Storm Drainage Improvement Project is bordered by Arnold Drive to the north, Central Avenue to the south, Temple Lane to the east and Eastway Drive to the west. This project area is within a drainage area of approximately 200 acres and the improvements may include pipe system upgrades and channel improvements.
This contract will be for the design and construction of a gravity outfall sewer along the Rocky River. This project will consist of approximately 3,600 linear feet of 15-inch and 2,400 linear feet of 12-inch gravity sanitary sewer piping. This outfall is tributary to the existing Rocky River outfall in Cabarrus County and Water and Sewer Authority of Cabarrus County (WSACC) Rocky River Regional Wastewater Treatment Plant.
this opportunity was archived earlier
This contract will be for the design and construction of a gravity outfall sewer along the Rocky River. This project will consist of approximately 3,600 linear feet of 15-inch and 2,400 linear feet of 12-inch gravity sanitary sewer piping. This outfall is tributary to the existing Rocky River outfall in Cabarrus County and Water and Sewer Authority of Cabarrus County (WSACC) Rocky River Regional Wastewater Treatment Plant.
This opportunity has been cancelled as of 12/18/2024
This contract will be for the construction of 1,929 linear feet of 24-inch gravity sewer. This contract will be funded as a developer reimbursable. The project will be located in West Charlotte along Dixie River Road.
this opportunity was archived earlier
Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential, and commercial properties.
This project consists of the installation of Storm Water structures including pipe, curb, manholes, headwalls, and hydrodynamic separators to improve water quality at the adjacent surface water.
Work performed under this contract will consist of storm water infrastructure maintenance, repair and improvement projects within the city limits of Charlotte, NC. Work may include but is not limited to mobilization, earthwork, installation of storm drainage structures and pipes/culverts, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm drainage structure and pipe repair and/or rehabilitation pipe lining, water and sanitary sewer (relocations, installations, and adjustments). Locations of work will vary and can be within public right of way, private property with easements or a combination of both.
Charlotte Water (CLTWater) is soliciting Statements of Qualifications (SOQ) from qualified engineering companies (Company or Proposer) to provide the design of relocations and installation of new water and sewer infrastructure within North Carolina Department of Transportation (NCDOT), Charlotte Department of Transportation, CATS and rail projects for the Miscellaneous Water and Sewer Engineering Services Project (Project).
The following is a general description of the tasks required. This is not intended to be all-inclusive, nor is it guaranteed that all of the below tasks will be utilized. A more defined Scope of Work will be developed during negotiation with the selected companies. CLTWater is responsible for the design of all public water and sanitary sewer utilities located within NCDOT projects. In addition, CLTWater utilizes water/sewer consulting firms to facilitate relocations and improvements in various governmental projects. This includes projects by the City of Charlotte, Mecklenburg County, and surrounding towns or municipalities. These Projects may include the design of water and/or sewer mains, relocation and betterment of utilities for various NCDOT improvement projects, future water and/or sanitary sewer crossings within NCDOT right of way, Miscellaneous Water and Sewer Engineering Services projects, service connections, rehabilitation of existing infrastructure, and other projects as determined by CLTWater. This Project can also be utilized to address utility conflicts and improvements that may be needed on other projects.
The purpose of this project is to increase capacity along Rea Road. Capacity will be increased by utilizing the right turn lane drops and median to develop an additional NB and SB through lane along Rea Road between the I-485 ramps and Williams Pond Lane. This project will also result in increased turn lane capacity and intersection improvements at Piper Station Drive and Ballantyne Commons Parkway. Pedestrian safety and mobility will be improved by providing sidewalks on both sides of Rea Road. Other specific improvements include: curb and gutter, accessible ramps, and driveways.