Wood Dale Ter 2022

Project consists of removing a gabion wall and replacing it with a new segmental block wall.  Minimal stream impacts will be made only to install wall. Partial storm system in ROW will be removed and replaced with no outfall impacts.

2500 Briargrove Dr.

This project involves installing a closed drainage system down both Briargrove Dr. and Milton Rd. to reroute runoff from an existing stream. The proposed closed drainage system ties back into the existing culvert under Colby Pl.

718 Harwyn Dr.

Project proposed to replace an existing culvert system under Harwyn Dr. with 2 – 3×5 box culverts, as well as a pipe cleaning effort through the triple 54” RCP culvert at downstream Eaves Ln.

Harrisburg Road Shared Use Path (SUP) – Ponderosa Pine to Colwick Hill

Improvements on Harrisburg Road between Ponderosa Pine Lane and Colwick Hill Road, including a pedestrian hybrid beacon in between Denbur Drive and Cedarbrook Drive to create a more pedestrian-oriented corridor. Improvements will primarily include shared use path, sidewalk, drainage, mid-block pedestrian crossing, curb and gutter, and milling and overlay of asphalt.

Unspecified Time and Materials Water & Sewer Repairs – Phase 2

The Project consists of providing equipment, vehicles, machinery, implements, tools, supplies, incidentals, and skilled personnel to complete unspecified modifications, maintenance, and repairs to existing water and sewer lines in the Charlotte Water service area.

Pennwood/Amado Storm Drainage Improvement Project

The project is located at 5430 Amado and in the Pennwood Lane Cul-de-sac and continues through the backyards to provide drainage to the channel downstream. The project involves storm drainage improvements to improve the storm drainage system in the roadway, to repair failing infrastructure and to improve drainage to the downstream channel.

FY26 Water and Sewer Infrastructure Construction – Contract 2

The Project consists of an undetermined number of individual projects consisting of water and/or sewer extensions, water and/or sewer replacements, low-pressure sanitary sewer, water distribution system reliability improvement projects, and/or sanitary sewer capacity assurance projects, which will be assigned by the Project Engineer.