The project involves analysis of existing conditions to determine areas suitable for improvement, planning analysis of improvement alternatives, and the design and construction of the needed improvements in the Bonwood Storm Drainage Improvement Project (SDIP) area. The Bonwood SDIP is bordered by Wendover Road to the south, Canterbury Drive to the east and Chadsford Place to the west. This project is within a drainage area of approximately 124 acres and the improvements include paving, curb and gutter, culvert replacements, pipe system lining/repair and upgrades, and minor open channel improvements. |
Chatham Storm Drainage Improvement Project
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.
5508 Hughes Drive Storm Drainage Improvement Project
Work performed under this contract will consist of the installation of storm drainage, updated drainage system outfall, curb, gutter, and resurfacing of the cul-de-sac.
911 Georgetown Storm Drainage Improvement Project
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.
Beckwith-Meadow Storm Drainage Improvement Project
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.
Sandy Porter S Tryon Intersection Improvements
This project includes pedestrian safety and capacity improvements at the intersection of Sandy Porter and South Tryon Street. The project will add a left turn lane off of South Tryon onto Sandy Porter and install widened sidewalks.
Unspecified Water and Sewer Repairs
This contract covers on-call repairs for water and sewer systems throughout Charlotte Water’s collection and distribution areas. Work may include emergency mobilization for critical pipeline repairs and other maintenance activities. The contract ensures rapid response capabilities for unforeseen infrastructure issues.
Ashe Plantation Phase II Upgrades – Re-Advertisement for Bids
The Project consists of the demolition of the existing 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration, clarifiers), filters, generator, shed and select yard piping. The new infrastructure includes a new 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration), two
clarifiers, pre-engineered office/lab building, generator and the associated yard piping, site work, electrical and instrumentation. This scope of work also includes the relocation of and existing 8” gravity sewer line.
Ashe Plantation WWTP – Phase II Upgrades
The Project consists of the demolition of the existing 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration, clarifiers), filters, generator, shed and select yard piping. The new infrastructure includes a new 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration), two clarifiers, pre-engineered office/lab building, generator and the associated yard piping, site work, electrical and instrumentation. This scope of work also includes the relocation of and existing 8” gravity sewer line.