Stowe Regional Water Resource Recovery Facility Solids Forcemain – CANCELLED

Stowe Regional Water Resource Recovery Facility is a new 15 million gallons per day greenfield facility that will serve as CLTWater’s 6th Water Resource Recovery Facility. Stowe Regional Water Resource Recovery Facility will not have solids treatment onsite. The Stowe Regional Water Resource Recovery Facility solids pump station will send the solids stream to another CLTWater water resource recovery facility for treatment. This is a hard bid construction project to build the first phase of the offsite forcemain.

Stowe Regional Water Resource Recovery Facility Solids Pump Station

Stowe Regional Water Resource Recovery Facility is a new 15 million gallons per day greenfield facility that will serve as Charlotte Water’s 6th Water Resource Recovery Facility. Stowe Regional Water Resource Recovery Facility will not have solids treatment onsite. The Stowe Regional Water Resource Recovery Facility solids pump station will send the solids stream to another Charlotte Water Water Resource Recovery facility for treatment. This is a hard bid construction project to build the pump station and associated infrastructure onsite.

Collective AG Storm Water Drainage Improvement Project

Collective Storm Drainage Improvement Projects Series AG will involve 2 projects throughout the City of Charlotte, 1845 Pinewood Cr and 6009 Rexwood Pl.  1845 Pinewood Cr will consist of reinforced concrete pipe replacement and realignment, CIPP liner, storm drainage structure replacement, full depth asphalt, curb and gutter, concrete driveway, new sanitary sewer pipe and sanitary sewer structures, and new watermain.  6009 Rexwood Pl will consist of reinforced concrete pipe replacement and realignment, CIPP liner, storm drainage structure replacement, full depth asphalt, curb and gutter, and concrete driveway.

FY24 Water Main Replacement – Contract 1-cancelled

This contract will consist of an undetermined number of individual projects consisting of water and/or sewer replacements, water and/or sewer extensions, and water distribution system reliability improvement projects, which will be assigned by the Project Engineer.

This project has been cancelled

FY24 Sanitary Sewer Rehab and Replacement – cancelled

The work is generally described as follows: rehabilitation of manholes, repair of sewer system defects and service laterals, installation of new sewers and manholes to replace existing sewers and manholes, installation of cured-in-place pipe lining, pipe bursting, other miscellaneous manhole rehabilitation work, and all preparatory work such as sewer cleaning and television inspection.

this opportunity was archived earlier

FY24 Sanitary Sewer Rehab and Replacement-CANCELLED

The work is generally described as follows: rehabilitation of manholes, repair of sewer system defects and service laterals, installation of new sewers and manholes to replace existing sewers and manholes, installation of cured-in-place pipe lining, pipe bursting, other miscellaneous manhole rehabilitation work, and all preparatory work such as sewer cleaning and television inspection.

Cancelled as of 10/21/2024

Paw Creek Sewer Rehabilitation and Sewer Diversion-cancelled

This project consists of the sanitary sewer rehabilitation of approximately 4,700 LF of sewer outfall with cured-in-place lining. This project will extend along the Paw Creek outfall. A 112 LF, 24-inch diversion sewer will also be constructed under Briar Creek along with a 118 LF, 8-inch LF collector sewer. All work will occur within Charlotte Water’s existing easement. A small portion of work on a county parcel.

this opportunity has been cancelled

Firehouse #11 Replacement

Charlotte Firehouse #11 located at 620 W. 28th Street is one of the older CFD facilities. The building has a pressing need for repair and upgrades. This project will remove and replace the existing firehouse with a facility which meets modern day needs.  The project will produce a new 17,000 SF, 4-bay two-story firehouse.

Sweden Rd Surface Water Quality Improvement project

The project is located at an existing CDOT facility located at 4600 Sweden Rd. The project improvements include the installation of SCMs along the perimeter of the existing parking areas to capture, treat, and reduce runoff discharge pollutants that are contributing to the Sugar Creek watershed in compliance with site NPDES permit requirements.