Upper Little Sugar Creek Replacement Sewer – Phase 2 and Phase 3 from Bilmark Avenue to Canterwood Drive and 911 Georgetown Storm Drainage Improvement Project (SDIP)

The Project consists of the installation of 250 LF of 8” sewer; 3,060 LF of 16” sewer; 3,100 LF of 18” sewer; 37 manholes; bypass pumping of wastewater; and other related sewer installation/replacement work for the Upper Little Sugar Creek Replacement Sewer Phases 2 and 3 portions. For the 911 Georgetown SDIP, the project consists of the Installation of 394 LF of 5’ X 4’ Precast R.C. Box Culvert; 60 LF of 10’ X 8’ Precast R.C. Box Culvert; 9 masonry drainage structures; and other related storm drainage installation work.

9th and College Storm Drainage Improvement Project

The 9th and  College Storm Drainage Improvement Project is located in Uptown Charlotte within the 9th Street Right-of- Way between North College Street and the CATS Blue Line Extension light rail. The project will upgrade and replace storm drainage, sanitary sewer, and water main infrastructure within this block of 9th Street. The project will also include sidewalk, hardscape, pavement, and pavement markings replacement.

FY2020 A-D Storm Water Repair and Improvement

Specialized stormwater services

 

Archived solicitations link

FY2020A -https://charlottenc.gov/DoingBusiness/Pages/SolicitationDetails.aspx?ID=1120

FY2020B

https://charlottenc.gov/DoingBusiness/Pages/SolicitationDetails.aspx?ID=1121

FY2020C

https://charlottenc.gov/DoingBusiness/Pages/SolicitationDetails.aspx?ID=1158

FY2020D

https://charlottenc.gov/DoingBusiness/Pages/SolicitationDetails.aspx?ID=1159

Wilkinson Boulevard ITS Phase 2 – CANCELLED

This project will install single‐mode fiber optic cable installed in new directionally bored, hand-dug and trenched conduit, existing conduit, and aerial attachments to poles. It will remove existing copper communication cables. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.

Graham Street Extension Intelligent Transportation Systems

This project will install single‐mode fiber optic cable in existing conduits. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.

Sardis Road Intelligent Transportation System (ITS) – CANCELLED

This project will install single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.

West Boulevard ITS – CANCELLED

This project will install single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.

Sugar Creek Road ITS – CANCELLED

This project will install single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. It will remove existing copper communication cables. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.