Bryant Farms Sidewalk

“construction contract for sidewalk project sidewalk along Bryant Farms Road between Hawk Ridge Elementary School and Elm Lane. The total project length is approx. 1.02 miles

7141 Star Valley Drive Storm Drainage Improvement Project

Storm Drainage Improvement Project. The purpose and need for the Project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.

Queens Road Phase II Storm Drainage Improvement Project

Storm Drainage Improvement Project. The purpose and need for the Project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.

Chandworth Storm Drainage Improvement Project

Storm Drainage Improvement Project. The purpose and need for the Project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.

Cross Charlotte Trail (XCLT)− Brandywine to Tyvola

The scope and purpose of this project is to complete the City’s 1.5-mile segment of the Cross-Charlotte Trail from the southern end of the existing greenway north of Brandywine Rd to where the County’s new segment begins on the north side of Tyvola Rd.

Rozzelles Ferry Pedscape

This project will provide new pedestrian refuge medians, new sidewalk, new wheelchair ramps, landscaping with street trees, drainage improvements, and street resurfacing. Project length is 0.706 Miles.

25th Street

The project limits are from N. Davidson to N. Brevard and will connect 25th Street over Little Sugar Creek via a bridge. It will add curb, gutter, sidewalk, planting strips, street lights, street trees, These improvements will improve accessibility for pedestrians and bicyclists, and by providing vehicular connections to the 25th Street Station.

Southpark Enhanced Crosswalks -Phase 1

This project will install new curb ramps, custom crosswalk striping, and leading pedestrian interval signals at Morrison/Sharon and Sharon/Fairview intersections