The Charlotte Department of Transportation (CDOT) Street Maintenance Division (SMD) is responsible for the maintenance of more than 2,200 miles of sidewalks and more than 7,000 accessible ramps within the City of Charlotte. The scope of this work consists of the removal of concrete tripping hazards from sidewalks, curb ramps, and concrete curbing that the City agents have identified. All work produced must be compliant with the Americans with Disabilities Act (ADA) requirements for slope and Occupational Safety and Health Administration requirements for traction. The company will be responsible for all traffic control in accordance with the most recent Work Area Traffic Control Handbook (WATCH). Any debris resulting from the removal of trip hazards must be removed in a legal manner.
Storm Water Repair and Improvement FY2021-A
Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential and commercial properties.
Storm Water Repair and Improvement FY2021-A
Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential and commercial properties.
FY2020 A-D Storm Water Repair and Improvement
Specialized stormwater services
Archived solicitations link
FY2020A -https://charlottenc.gov/DoingBusiness/Pages/SolicitationDetails.aspx?ID=1120
FY2020B
https://charlottenc.gov/DoingBusiness/Pages/SolicitationDetails.aspx?ID=1121
FY2020C
https://charlottenc.gov/DoingBusiness/Pages/SolicitationDetails.aspx?ID=1158
FY2020D
https://charlottenc.gov/DoingBusiness/Pages/SolicitationDetails.aspx?ID=1159
FY19D Storm Water Repair and Improvement
Specialized stormwater services
Wilkinson Boulevard ITS Phase 2 – CANCELLED
This project will install single‐mode fiber optic cable installed in new directionally bored, hand-dug and trenched conduit, existing conduit, and aerial attachments to poles. It will remove existing copper communication cables. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.
Graham Street Extension Intelligent Transportation Systems
This project will install single‐mode fiber optic cable in existing conduits. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.
Sardis Road Intelligent Transportation System (ITS) – CANCELLED
This project will install single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.
West Boulevard ITS – CANCELLED
This project will install single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.