Work performed under this transportation repair (TR) contract will consist of storm water infrastructure maintenance, repair and maintenance projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential and commercial properties. See section 1.28 – Scope of Work for additional details and information.
Sweden Road Water Quality Enhancement Project
This project consists of the installation of Storm Water structures including pipe, curb, manholes, headwalls, and hydrodynamic separators to improve water quality at the adjacent surface water.
CDOT Sweden Rd EVSE
In June 2018, the Sustainable and Resilient Charlotte by 2050 Resolution was unanimously passed by City Council. This resolution set aggressive and aspirational municipal and community-wide greenhouse gas emissions reduction goals for the City of Charlotte. Specifically, it strives to have City fleet and facilities be fueled by 100% zero-carbon sources by 2030. The CDOT Sweden Rd facility currently contains many fleet vehicles and buses that are run on gasoline. In order to meet the 2030 target, the City has begun and will continue purchasing Electric Vehicles (EV’s) and equip the CDOT Sweden Rd Facility with EV Chargers.
Solid Waste EVSE
In June 2018, the Sustainable and Resilient Charlotte by 2050 Resolution was unanimously passed by City Council. This resolution set aggressive and aspirational municipal and community-wide greenhouse gas emissions reduction goals for the City of Charlotte. Specifically, it strives to have City fleet and facilities be fueled by 100% zero-carbon sources by 2030. The Solid Waste facility currently contains many refuse collection vehicles that are run on gasoline. In order to meet the 2030 target, The City has begun and will continue purchasing Electric Vehicles (EV’s) and equip the Solid Waste facility with EV Chargers for refuse collection vehicles.
CATS N. Davidson EVSE Hub – Bid Opportunity
In June 2018, the Sustainable and Resilient Charlotte by 2050 Resolution was unanimously passed by City Council. This resolution set aggressive and aspirational municipal and community-wide greenhouse gas emissions reduction goals for the City of Charlotte. Specifically, it strives to have City fleet and facilities be fueled by 100% zero-carbon sources by 2030.The N. Davidson CATS facility currently contains many fleet vehicles and buses that are run on gasoline. In order to meet the 2030 target, The City has begun and will continue purchasing Electric Vehicles (EV’s) and equip the N. Davidson CATS facility with EV Chargers.
Rea Road Widening (I-485 to Williams Pond Lane)
The purpose of this project is to increase capacity along Rea Road. Capacity will be increased by utilizing the right turn lane drops and median to develop an additional NB and SB through lane along Rea Road between the I-485 ramps and Williams Pond Lane. This project will also result in increased turn lane capacity and intersection improvements at Piper Station Drive and Ballantyne Commons Parkway. Pedestrian safety and mobility will be improved by providing sidewalks on both sides of Rea Road. Other specific improvements include: curb and gutter, accessible ramps, and driveways.
University City Blvd Pedestrian Crossings
This Project will install 270 LF of proposed 12′ wide multi-use-path, curb ramps, crosswalks across NC 49, Pedestrian concrete island, milling/resurfacing, storm drainage and pedestrian hybrid beacon with mast arms near the intersection of University Blvd and Mark Twain Road. This project will also install pedestrian crossings, wheelchair ramps, traffic signals milling/resurfacing and storm drainage system at the intersection of University City Blvd and Suther Rd.91347
LaSalle Street/Beatties Ford Road Intersection Improvements
Install decorative crosswalks (interconnected preformed thermoplastic), milling and resurfacing, and pavement markings.
North Tryon St Left Turn Lane at University City Blvd
The purpose of this project is to improve traffic flow on North Tryon Street by extending the left turn lane. This project will include lane widening, drainage and pavement markings.