This project would add an additional pump to Cell #4 which is sized like the existing, and a capacity of 65 million gallons per day.
The Catawba River Water PS Cell 4 Pump Addition should be cancelled. It has been pushed out in the CIP and will not be available in January 2024. There is no updated timeline on this project.
CANCELLED – This project is on hold (or potentially canceled) with no anticipated date to advertise in the next 18 months.
This project will include the rehabilitation of the Plaza Road and Idlewild Booster Pump Stations. The rehab will include motor control center, soft start drives, station programmable logic controller control panel, pumps, motors, controls valves, suction & discharge piping, generator/transfer switch and necessary building & roof upgrades.
This project includes construction of approximately 6,000 LF of 24 inch water main.
The Project consists of roofing replacement for Package 8 – Catawba River Pump station Generator Building and Package – 9 the Franklin Water Treatment Plant Aluminum Feed Building, Maintenance Building, Raw Water Pump Station, and High Service Pump Station #2.
The proposed project is to fund the design and construction of a two train thermal hydrolysis system at McAlpine Wastewater Treatment Plant.
Hauling non-hazardous spoils and soils from Charlotte Water Field Operation zones