This project includes construction of approximately 6,000 LF of 24 inch water main.
Roofing Replacement (W2R2) – Construction Package 8 Catawba River Pump Station; Roofing Replacement (W2R2) – Construction Package 9 Franklin Water Treatment Plant (WTP)
The Project consists of roofing replacement for Package 8 – Catawba River Pump station Generator Building and Package – 9 the Franklin Water Treatment Plant Aluminum Feed Building, Maintenance Building, Raw Water Pump Station, and High Service Pump Station #2.
Thermal Hydrolysis System at McAlpine
The proposed project is to fund the design and construction of a two train thermal hydrolysis system at McAlpine Wastewater Treatment Plant.
Soil/Spoil Hauling
Hauling non-hazardous spoils and soils from Charlotte Water Field Operation zones