This project consists of an undetermined number of individual projects consisting of water and/or sewer extensions, water and/or sewer replacements, low pressure sanitary sewer, water distribution system reliability improvement projects, and/or sanitary sewer capacity assurance projects, which will be assigned by the Project Engineer.
New Service Installation Water – Cancelled
Combined with another project
Energy Optimization – Pumping – Cancelled
This project will evaluate all pumping units in the water system.
Brookshire Campus Project – Cancelled
This project reviews the Franklin campus as a working facility for both Charlotte Water office personnel and Treatment Plant Operations.
McAlpine Large Diameter Sewer Rehabilitation – Phase 2
This project involves the rehabilitation of approximately 7,000 linear feet of reinforced concrete pipe (RCP) sewer outfall. The sewer outfall is located just south of Highway 51, running parallel to McAlpine Creek. The work will improve the structural integrity and performance of the sewer system.
Large Diameter Sanitary Sewer Rehabilitation-Cancelled
This project provides for rehabilitation, repair and replacement of sewers greater than 16-inch in diameter.
Water Distribution System Design and Reliability Improvements-Cancelled
Project provides for water distribution system improvements related to improving system efficiency and reliability.
Sewer Lift Station Force Main Replacement and Rehabilitation – Cancelled
Project will provide pipeline rehabilitation and any needed improvements to the air release valves.
Street and Minor Sewer Main Extension-Cancelled
This contract provides for sewer service extensions to residential customers. Project also provides for extensions when health hazards arise in association with failed septic tanks, demand beyond capacity, or failure of on-site disposal systems.