Upper Taggart Creek Outfall Replacement

Project includes the construction of approximately 10,200 linear feet of 36, 30, 24, and 18 inch gravity sewer to address capacity concerns in the Upper Taggart Creek Outfall.

Airport North End Around Taxiway (NEAT) Overlook Relocation – Construction

The NEAT Overlook Relocation includes the construction of a new Airport Overlook Drive, installation of a sanitary sewer force main routed along the west side of the new Airport Overlook Drive continuing to a septic field located easterly of the intersection with Old Dowd Road, a 683 square foot restroom building with utility service, a 145-vehicle paved and lighted parking area, a bus/food truck parking area, picnic tables, benches, and an open recreation area within a 4.23 acre fenced site.

PS & WAS Pipelines from Irwin to McAlpine-Cancelled

Two separate lines will be needed for the solids transfer to handle the PS and WAS respectively. The PS & WAS Pipelines from Irwin Creek to McAlpine Creek Wastewater Treatment Plant will be approximately 12 miles.

Catawba River Water Pump Station Cell 4 – Pump Addition -CANCELLED

This project would add an additional pump to Cell #4 which is sized like the existing, and a capacity of 65 million gallons per day.

The Catawba River Water PS Cell 4 Pump Addition should be cancelled.  It has been pushed out in the CIP and will not be available in January 2024.  There is no updated timeline on this project.

Plaza Booster Pump Station Upgrades – CANCELLED

CANCELLED – This project is on hold (or potentially canceled) with no anticipated date to advertise in the next 18 months.

 

This project will include the rehabilitation of the Plaza Road and Idlewild Booster Pump Stations. The rehab will include motor control center, soft start drives, station programmable logic controller control panel, pumps, motors, controls valves, suction & discharge piping, generator/transfer switch and necessary building & roof upgrades.