The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.
5508 Hughes Drive Storm Drainage Improvement Project
Work performed under this contract will consist of the installation of storm drainage, updated drainage system outfall, curb, gutter, and resurfacing of the cul-de-sac.
911 Georgetown Storm Drainage Improvement Project
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.
Beckwith-Meadow Storm Drainage Improvement Project
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.
Backlot Trail
This project will install a 10-foot asphalt path that connects Park South Drive to Park Road. This will include two pedestrian signals.
DeArmon Road Improvements Project
The DeArmon Road Improvements Project is part of the City of Charlotte’s Prosperity Village Comprehensive Neighborhood Improvement Program. The project will complete the infrastructure needs in the neighborhood by providing buffered bicycle lanes, median/turning lane, storm drainage, curb & gutter, sidewalk and a greenway passage beneath DeArmon Road for the future extension of Clark’s Creek Greenway.
Lakeview-Reames Intersection Improvement and Sidewalk
This project will provide a roundabout at the intersection of Lakeview Road and Reames Road, and a sidewalk on Lakeview Road between Beatties Ford Road and Reames Road. This project is located in the Beatties Ford Road Comprehensive Neighborhood Improvement Program (CNIP) Area.
Kilborne Drive Streetscape
This project will improve Kilborne Drive from the Eastway Drive intersection to just South of Havenwood Road. Improvements include painted buffered bike lanes, sidewalk, ped crossing medians, traffic calming and street trees. Project connects to the Central/Kilborne/Norland project South of Havenwood Road. (Project length= 0.9 miles)
Uptown Cycle Track- 6th St Crossing Gate Construction
Project includes the installation of a crossing gate arm over 6th St. at the Lynx Blue Line in coordination with the 6th St. cycle track currently under construction by the Uptown Cycle Track project.