The objective of this RFP is to solicit proposals for chemical grouting and pipe lining services.
The company shall provide chemical grouting and cured in place pipe lining at various public and private locations as needed within the City of Charlotte. The services included are but not limited to:
-
- Chemical grouting, and cured in place pipe lining
- Provide professional consultant service for best practices
- Provide recommendation on the installation process
- Provide recommendation during the design and installation phase of the project
- Provide professional representation during the design and installation of the project
-
- Installation process
- Shall be able to install chemical grouting, and cured in place pipe lining
- Shall be able to remove and replace
- Storm drainage structures
- Curb & gutter
- Asphalt
- Incidental work to complete the chemical grouting, and cured in place pipe lining
This project will construct a bridge over I-85 to directly connect Doug Mayes Place and Louis Rose Place. This will relieve congestion a the WT Harris Blvd/ I-85 and Mallard Creek Church Rd/ I-85 interchanges.
This project will construct a bridge over I-85 to directly connect Doug Mayes Place and Louis Rose Place. This will relieve congestion at the WT Harris Blvd/ I-85 and Mallard Creek Church Rd/ I-85 interchanges.
Improvements on Monroe Road between North Wendover Road and Eaton Road to create a more pedestrian-oriented corridor and install a pedestrian hybrid beacon in front of Time Out Youth Center. Improvements will primarily include shared-use paths, drainage, and midblock pedestrian crossings.
This project will fill in gaps in the existing sidewalk system on the south side along Tuckaseegee Road from Little Rock Road to West Mecklenburg High School, and along the north side of Tuckaseegee Road from Burkholder Road to Toddville Road.
This project will improve the Idlewild Road and Monroe Road intersection to enhance conditions for all users. Improvements will include pavement widening to accommodate dual left turn lanes at all intersection approaches, bike lanes or multi-use paths, pedestrian refuge islands, and new sidewalks.
This project will improve the Idlewild Road and Monroe Road intersection to enhance conditions for all users. Improvements will include pavement widening to accommodate dual left turn lanes at all intersection approaches, bike lanes or multi-use paths, pedestrian refuge islands, and new sidewalks.
This project consists of constructing a new Vacuum Truck Receiving Station, a new canopy extension over existing concrete-walled material storage bays, and appurtenant facilities at the Charlotte Water Field Operations Operation Zone 2 Facility.
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.