Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve: mobilization, earthwork, drainage structures, storm drain pipe systems, and channels. Additional work will include: working over, under, near, and around existing private utilities, asphalt paving concrete flatwork, landscaping, and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within the street right-of-way.
Storm Water Repair and Improvement FY2023-C
Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve: mobilization, earthwork, drainage structures, storm drain pipe systems, and channels. Additional work will include: working over, under, near, and around existing private utilities, asphalt paving concrete flatwork, landscaping, and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within the street right-of-way.
Brown Grier Road Upgrades
This project will widen the two-lane road to a four-lane median-divided road with multi-use paths between Steele Creek Road and Whitehall Park Drive, and a multi-use path north along Sandy Porter Road to the subdivision at Williams Glenn Road.
Beatties Ford Rd (LaSalle- Oaklawn) Sidewalks Ph. 1
This project will add sidewalks and amenities along Beatties Ford Rd between LaSalle St and Oaklawn Ave.
Cemetery- Phase 2 Pipe Lining CANCELLED
This project provides for renovations of deteriorating and/or inadequate roadway and drainage infrastructure in City- owned cemeteries.
CHEMICAL GROUTING AND PIPE LINING
The objective of this RFP is to solicit proposals for chemical grouting and pipe lining services.
The company shall provide chemical grouting and cured in place pipe lining at various public and private locations as needed within the City of Charlotte. The services included are but not limited to:
-
- Chemical grouting, and cured in place pipe lining
- Provide professional consultant service for best practices
- Provide recommendation on the installation process
- Provide recommendation during the design and installation phase of the project
- Provide professional representation during the design and installation of the project
- Chemical grouting, and cured in place pipe lining
-
- Installation process
- Shall be able to install chemical grouting, and cured in place pipe lining
- Shall be able to remove and replace
- Storm drainage structures
- Curb & gutter
- Asphalt
- Incidental work to complete the chemical grouting, and cured in place pipe lining
- Installation process
I-85 North Bridge (Rebid)
This project will construct a bridge over I-85 to directly connect Doug Mayes Place and Louis Rose Place. This will relieve congestion at the WT Harris Blvd/ I-85 and Mallard Creek Church Rd/ I-85 interchanges.
I-85 North Bridge
This project will construct a bridge over I-85 to directly connect Doug Mayes Place and Louis Rose Place. This will relieve congestion a the WT Harris Blvd/ I-85 and Mallard Creek Church Rd/ I-85 interchanges.
Monroe Road Streetscape
Improvements on Monroe Road between North Wendover Road and Eaton Road to create a more pedestrian-oriented corridor and install a pedestrian hybrid beacon in front of Time Out Youth Center. Improvements will primarily include shared-use paths, drainage, and midblock pedestrian crossings.