The Project consists of the demolition of the existing 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration, clarifiers), filters, generator, shed and select yard piping. The new infrastructure includes a new 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration), two clarifiers, pre-engineered office/lab building, generator and the associated yard piping, site work, electrical and instrumentation. This scope of work also includes the relocation of and existing 8” gravity sewer line.
Ashe Plantation Phase II Upgrades – Re-Advertisement for Bids
The Project consists of the demolition of the existing 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration, clarifiers), filters, generator, shed and select yard piping. The new infrastructure includes a new 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration), two
clarifiers, pre-engineered office/lab building, generator and the associated yard piping, site work, electrical and instrumentation. This scope of work also includes the relocation of and existing 8” gravity sewer line.