Firehouse #30, currently located at 4707 Belle-Oaks Drive, near Charlotte Douglas Airport, is currently located in a house built in 1955 and needs extensive renovations. The facility is the only firehouse where crews must leave their living quarters to access their apparatus, as a result, in impacting response time.
Firehouse #30 design services with the use of Advance Planning funds will be utilized to build a replacement 3-bay 2-story firehouse to manage response volumes in the Beam Road/Airport area. The new facility will be approximately 14,000 square feet. The building will be located at 3019 Beam Road, directly across from the Police and Fire Academy, and the parcel ID number is 141-24-104. It is located in Council District 3. The firehouse design will be the same floor plan design as Hidden Valley Firehouse #45 (HVFH#45). This project is also designated to be an all-electric firehouse and additional scope will be added.
Remove and dispose of the existing roof system including flashings and sheet metal down to the existing poured gypsum deck. Provide base sheet mechanically attached to roof deck. Provide vapor retarder. Provide roof insulation system. Provide a cold adhesive applied two-ply modified bitumen roof membrane along with flashings and accessories. Replace sheet metal flashings and trim. Provide a complete, weathertight, 20-year warrantable roof assembly with 30-year finish warranty.
The existing roof area consist of a concrete deck, hot mopped asphalt base layer, a layer of tapered isocyanurate insulation, a one and three-quarter inch layer of perlite insulation, and a 2-ply modified bitumen roof membrane. The existing roof systems shall be removed to the deck. The deck shall be cleaned and prepared for reinstallation of roofing materials. Install a one and one-half inch base layer of isocyanurate insulation set in foam insulation adhesive. Adhere a new base layer to the existing concrete deck in foam insulation adhesive as required to meet 90psf uplift per FM Global. Install an additional layer of one-eigth inch per foot tapered isocyanurate insulation set in foam insulation adhesive. Install new silicon impregnated fiberglass reinforced cover board in foam insulation adhesive. Fully adhere new PVC membrane and flashings as specified herein and as shown in the project drawings as required by the manufacturer for a twenty-year (20) NDL Manufacturer’s Warranty. The new roof system shall be able to resist the win uplift loading.
The project consists of a roof replacement at Police and Fire Training Academy, in Charlotte, North Carolina. This work includes labor, materials, equipment, supervision, and administration to replace the existing two-ply modified bitumen roof system with the specified thermoplastic, single-ply roof system on 4 roof areas totaling approximately 59,115 square feet of roof area.