engineering-property-management-bluet  Department of General Services / Construction

Otts Street Facilities Roof Replacement Project

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon

Posting Number 2023-Q1(Jan-Mar)-DGS-10869

Anticipated Posting Date 2023-03-15

Commodity Code(s): 13574, 14560, 77000, 77009, 77093, 91023, 91066, 91078, 91473, 91891, 93670, 96177, 96894, 97568

Solicitation Link: https://charlottenc.gov/DoingBusiness/Pages/SolicitationDetails.aspx?ID=2154

The existing roof area consist of a concrete deck, hot mopped asphalt base layer, a layer of tapered isocyanurate insulation, a one and three-quarter inch layer of perlite insulation, and a 2-ply modified bitumen roof membrane. The existing roof systems shall be removed to the deck. The deck shall be cleaned and prepared for reinstallation of roofing materials. Install a one and one-half inch base layer of isocyanurate insulation set in foam insulation adhesive. Adhere a new base layer to the existing concrete deck in foam insulation adhesive as required to meet 90psf uplift per FM Global. Install an additional layer of one-eigth inch per foot tapered isocyanurate insulation set in foam insulation adhesive. Install new silicon impregnated fiberglass reinforced cover board in foam insulation adhesive. Fully adhere new PVC membrane and flashings as specified herein and as shown in the project drawings as required by the manufacturer for a twenty-year (20) NDL Manufacturer’s Warranty. The new roof system shall be able to resist the win uplift loading.

Requirements

Last Updated: 03/21/23
Insurance Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Twitter with Blue Background Logo of Facebook with Dark Blue Background

For Questions, Contact:

David Larson

City Contact

david.larson@charlottenc.gov