Copy of 16th Street Streetscape Phase 2 – DUPLICATE PLEASE ARCHIVE

This project is the second phase of 16th Street Streetscape project. Streetscape improvements include concrete sidewalk and ramps, curb and gutter, storm drainage, erosion control, slope grading work, and installation of a soil nail retaining wall on 16th Street adjacent to the Norfolk Southern parcel, at the northeast corner of N. Tryon Street and 16th Street intersection.

Copy of 16th Street Streetscape Phase 2

This project is the second phase of 16th Street Streetscape project. Streetscape improvements include concrete sidewalk and ramps, curb and gutter, storm drainage, erosion control, slope grading work, and installation of a soil nail retaining wall on 16th Street adjacent to the Norfolk Southern parcel, at the northeast corner of N. Tryon Street and 16th Street intersection.

Copy of 16th Street Streetscape Phase 2

This project is the second phase of 16th Street Streetscape project. Streetscape improvements include concrete sidewalk and ramps, curb and gutter, storm drainage, erosion control, slope grading work, and installation of a soil nail retaining wall on 16th Street adjacent to the Norfolk Southern parcel, at the northeast corner of N. Tryon Street and 16th Street intersection.

16th Street Streetscape Phase 2

This project is the second phase of 16th Street Streetscape project. Streetscape improvements include concrete sidewalk and ramps, curb and gutter, storm drainage, erosion control, slope grading work, and installation of a soil nail retaining wall on 16th Street adjacent to the Norfolk Southern parcel, at the northeast corner of N. Tryon Street and 16th Street intersection.

Pineville-Matthews Road/Alexander Road Sidewalk Project

This project will add sidewalk along Hwy 51 from Echo Forest Drive (Providence High School) to Alexander Road- and sidewalk on Alexander Road between Hwy 51 and Woodshed Court. The project will also add a right turn and a second left turn lanes on Alexander Road at Hwy 51. Project length= 1.0 mile.

2831 Flintridge Drive Storm Drainage Improvement Project

The 2831 Flintridge Drive Project will include the replacement of approximately 340LF of 48″ CMP with new 7’x3′ RCBC between open drainage channels behind 2831 and 2816 Flintridge Drive. The 7’x3′ RCBC installation will vary between 9-14 feet deep and will require active shoring approved by a professional engineer.

6th and Graham Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

Pebblestone Storm Drainage Improvement Project

Pebblestone Storm Drainage Improvement Project consist of channel stabilization and a parking lot rebuilt. The improvements will include approximately 250 linear feet of bank hard stabilization and 170 linear feet of bank soft stabilization. In addition to the channel stabilization, sanitary sewer improvements are required. 180 linear feet of 10-inch and 32 linear feet of 16-inch ductile iron restrained joint sanitary sewer pipe. 180 linear feet of 16-inch and 20 linear feet of 24-inch steel encasement pipe.