Morning Dale Storm Drainage Improvement Project

The Morning Dale Storm Drainage Improvement Project will reduce street and structure flooding throughout the neighborhood. Located within a drainage area of approximately 560 acres, the project will replace and/or rehabilitate aging infrastructure and provide adequate drainage system capacity. This project area is bordered by Hinson Drive to the north, Stratfordshire Drive to the south, Tadlock Place to the east and Morning Dale Road to the west.

Lawyers Rd SW (Harri Ann to Chestnut)

The scope of this project will include 0.34 miles of new 6ft wide concrete sidewalk, driveway improvements, and wheelchair ramps on Lawyers Rd from Chestnut Lake Dr to Harri Ann Dr.

Belk Greenway Connector

Belk Greenway Connector is a cycle track project. This project will involve shifting the medians on McDowell St to make room for the cycle track, replacing noncompliant curb ramps, replacing noncompliant pedestrian signals, transferring signal heads to new mast arms, mill & overlay, pavement markings, sign installation, and the removal of 4 median trees.

Arrowood at Whitehall Commons Intersection

This is an intersection project which will involve installing a new traffic signal with pedestrian signals, widening some of the approaches, replacing all curb ramps, mill & overlay, and pavement markings. The traffic signal will use steel strain poles.

Dry Detention Water Quality Enhancement Project

This project includes constructing forebays to increase pretreatment of solids and create sheet flow through the basin, removing and replacing of existing turf grass in the bottom of the basins with a hardier herbaceous vegetative mix that provides more treatment, and modification of outlet structures of basins that increase retention time within the basins to increase pollutant removal.

Collective AH (6633 Brookfield Place, 524 Wilby Drive)

524 Wilby Drive: The culvert will be constructed with a headwall and endwall, with the junction box In between. The 24” plastic pipe will be replaced with 24” RCP.

6633 Brookfield Place: 30” RCP from JB 9 to DCB 8 to be replaced with a 36” RCP , and curb to be added along Alexander Road and standard catch basins to be constructed along the curb.

Magnolia/Winthrop Storm Drainage Improvement Project

The Magnolia/Winthrop Storm Drainage Improvement Project (SDIP) consists of storm water infrastructure improvements along Ideal Way, Winthrop Avenue and Springdale Avenue. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, water and sewer (relocations, installations and adjustments), traffic control and any other associated work required by the Engineer.

 

Pella Rd 6212 Project

Project consist of joint repairs and the lining of 563 LF of 66 CMP with CIPP.  Three non-standard and three standard structures will be removed/replaced as well as two headwalls.  57 LF of 24 inch RCP will be removed and replaced. A rip rap apron will be revised/installed.  70 LF of an 8″ water main will also be relocated.

Faulconbridge Rd 5749 Project

Project consists of lining 556 LF of 42 inch CMP and 131 LF of 15 inch RCP with CIPP.  Eight existing drainage structures will be removed and replaced and two additional structures will be added. 221 LF of 15″ RCP will be removed and replaced. Chemical grouting joint repair will also be installed at approx. 15 locations throughout the 42″ CMP.