Improvements on Harrisburg Road between Ponderosa Pine Lane and Colwick Hill Road, including a pedestrian hybrid beacon in between Denbur Drive and Cedarbrook Drive to create a more pedestrian-oriented corridor. Improvements will primarily include shared use path, sidewalk, drainage, mid-block pedestrian crossing, curb and gutter, and milling and overlay of asphalt.
Harrisburg Road Shared Use Path (SUP) – Robinson Church Rd to Timbertop Ln
Improvements on Harrisburg Rd starting near Robinson Church Road and extending to Timbertop Lane to create a more pedestrian-oriented corridor. Improvements will primarily include shared use path, drainage, curb and gutter, and milling and overlay of asphalt.
Safe Streets for All (SS4A) – Phase 1
This project includes safety improvements at 8 sites, focusing on low-cost, high-impact measures such as pedestrian crossings, accessible pedestrian signals (APS), leading pedestrian intervals (LPIs), and priority projects from a Safe Routes to School study.
Hunter Acres Water Quality Enhancement Project
The City of Charlotte Storm Water Services has proposed a repair project for an existing pond called Hunter Acres Pond. The pond is located on Crestland Avenue, near the intersection of Crestland Avenue and Cornelia Drive, and the Parcel ID is 04302401. The pond is identified in the NC Dam Safety Inventory as MECKL-207-H and is classified as a high hazard dam. The forebay is located approximately 200 feet west of the main dam embankment.
Bryant Farms Phase 2 (Progressive Design-Build)
This purpose of the Bryant Farms Road Extension, Phase II project is to continue the street connection of Bryant Farms Road between Rea Road and Ardrey Kell Road. The design is anticipated to include a two-lane road with turn lanes, shared-use path on both sides of the road, and improvements at the intersections of Bryant Farms Road with Rea Road, Tom Short Road, and Ardrey Kell Road. The project will also build a crossing over Flat Branch stream and will run adjacent to the Flat Branch Nature Preserve for a portion of the project.
Interested? Learn more at our Industry Day Event on 11/17!
McCullough Drive Extension
An extension of McCullough Drive, from it’s current terminus east
of southeast of North Tryon Street, to the disconnected terminus
southwest of W.T. Harris Blvd. It is already designed and real
estate acquired. This is necessary for splitting this project apart
from the McCullough Streetscape Project. Length = 0.272 miles
Mallard Creek Road Shared-Use Path (Governor Hunt to Driwood)
This project will construct a shared-use path along the east side of Mallard Creek Road from Governor Hunt Road to Driwood Court. Specific improvements will also include construction of a plant strip, curb and cutter, accessible ramps, driveways, and potential storm drainage improvements. The purpose of this project is to improve pedestrian safety, mobility, and connectivity along Mallard Creek Road. Project Length = 0.4 miles.
Old Concord Road Shared-Use Path (Meadow Vista to Arlyn Cir)
This project will construct a shared-use path along the west side of Old Concord Road from Meadow Vista Road to Arlyn Circle. Construction of driveway improvements and wheelchair ramps are included in this scope. The construction of the shared-use path will help to improve safety and walking conditions for citizens along this minor thoroughfare. This project will also connect several miles of pedestrian walkways within this area. Old Concord Road Shared-Use Path is considered a high priority project based on CDOT’s sidewalk Priority list and was requested by the residents and business owners in the area. Improvements for Charlotte Water are also included in the project scope. Project Length= .85 miles.
Kuykendall Road Improvements
This project will connect sidewalk along Kuykendall Road from
Thorn Blade Drive to McKee Road, and add a right-turn lane from
Kuykendall Road on to McKee Road in order to to increase
pedestrian safety and help alleviate traffic congestion at the
intersection. Project will also fill in small sidewalk gap on the south
side of McKee Rd at Kuykendall Rd and add pedestrian signals with
crosswalk at this intersection. Project length = approximately 0.75
miles.