Matheson Avenue Bridge Streetscape

This project will incorporate pedestrian, bicycle and bridge improvements on Matheson Avenue from North Tryon Street to Jordan Place. The project will include a westbound one-way bicycle path along the north side of Matheson Avenue and a two- way bicycle path and sidewalk along the south side. Both sides will include a three-foot buffer between the bicycle paths and the road.

Copy of 16th Street Streetscape Phase 2 – DUPLICATE PLEASE ARCHIVE

This project is the second phase of 16th Street Streetscape project. Streetscape improvements include concrete sidewalk and ramps, curb and gutter, storm drainage, erosion control, slope grading work, and installation of a soil nail retaining wall on 16th Street adjacent to the Norfolk Southern parcel, at the northeast corner of N. Tryon Street and 16th Street intersection.

Copy of 16th Street Streetscape Phase 2

This project is the second phase of 16th Street Streetscape project. Streetscape improvements include concrete sidewalk and ramps, curb and gutter, storm drainage, erosion control, slope grading work, and installation of a soil nail retaining wall on 16th Street adjacent to the Norfolk Southern parcel, at the northeast corner of N. Tryon Street and 16th Street intersection.

Copy of 16th Street Streetscape Phase 2

This project is the second phase of 16th Street Streetscape project. Streetscape improvements include concrete sidewalk and ramps, curb and gutter, storm drainage, erosion control, slope grading work, and installation of a soil nail retaining wall on 16th Street adjacent to the Norfolk Southern parcel, at the northeast corner of N. Tryon Street and 16th Street intersection.

16th Street Streetscape Phase 2

This project is the second phase of 16th Street Streetscape project. Streetscape improvements include concrete sidewalk and ramps, curb and gutter, storm drainage, erosion control, slope grading work, and installation of a soil nail retaining wall on 16th Street adjacent to the Norfolk Southern parcel, at the northeast corner of N. Tryon Street and 16th Street intersection.

Pineville-Matthews Road/Alexander Road Sidewalk Project

This project will add sidewalk along Hwy 51 from Echo Forest Drive (Providence High School) to Alexander Road- and sidewalk on Alexander Road between Hwy 51 and Woodshed Court. The project will also add a right turn and a second left turn lanes on Alexander Road at Hwy 51. Project length= 1.0 mile.

Flintridge Dr (2831) Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.