The project involves analysis of existing conditions to determine areas suitable for improvement, planning analysis of improvement alternatives, and the design and construction of the needed improvements in the Bonwood Storm Drainage Improvement Project (SDIP) area. The Bonwood SDIP is bordered by Wendover Road to the south, Canterbury Drive to the east and Chadsford Place to the west. This project is within a drainage area of approximately 124 acres and the improvements include paving, curb and gutter, culvert replacements, pipe system lining/repair and upgrades, and minor open channel improvements. |
Chatham Storm Drainage Improvement Project
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.
5508 Hughes Drive Storm Drainage Improvement Project
Work performed under this contract will consist of the installation of storm drainage, updated drainage system outfall, curb, gutter, and resurfacing of the cul-de-sac.
911 Georgetown Storm Drainage Improvement Project
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.
Backlot Trail
This project will install a 10-foot asphalt path that connects Park South Drive to Park Road. This will include two pedestrian signals.
DeArmon Road Improvements Project
The DeArmon Road Improvements Project is part of the City of Charlotte’s Prosperity Village Comprehensive Neighborhood Improvement Program. The project will complete the infrastructure needs in the neighborhood by providing buffered bicycle lanes, median/turning lane, storm drainage, curb & gutter, sidewalk and a greenway passage beneath DeArmon Road for the future extension of Clark’s Creek Greenway.
Sweden Road Concrete and Asphalt Pavement Project Phase 2
This project will install new concrete and asphalt pavement improvements at the Fleet Management Sweden Road shop.
Pleasant Grove Road Sidewalk- Cancelled
This project will construct sidewalk along the south side of Pleasant Grove Road from Hipp Road to Oakdale Elementary School. This project has been cancelled.
Shade Valley Realignment Project
Construction of a roundabout at the Shade Valley Road/ Oakhurst Commons Drive intersection and installing a 10 to 12 ft. concrete multi-use path along Monroe Road. Amenities include: sidewalk curb & gutter, planting strips, accessible ramps truck apron, pedestrian refuge islands, and a sand filter stormwater detention pond.