This unspecified contract will provide horizontal construction services on an as-needed basis to the General Services Department. The work includes: traffic control; erosion control; clearing and grading; drainage; milling; asphalt paving; pavement markings; retaining wall; concrete curb, sidewalk, and driveways; pedestrian refuge island, and wheelchair ramps; utility relocation and installations; and related activities.
McDowell Creek WRRF Primary Clarifier Mechanism Replacement-CANCELLED
The project involves the procurement of a new primary clarifier mechanism to replace the existing mechanism in Primary Clarifier #5 at the McDowell Creek Water Resource Recovery Facility. This replacement aims to improve the performance and reliability of the primary clarifier, ensuring that it meets current operational standards.
Duplicate entry of McDowell Creek WRRF Clarifier Mechanism, cancelled 11/14
McDowell Creek WRRF Primary Clarifier Rehabilitation
This project will rehabilitate Primary Clarifier #5 at the McDowell Creek Water Resource Recovery Facility. The scope of work includes the demolition and replacement of the existing clarifier mechanism, various concrete repairs, and regrouting of the clarifier floor. Additionally, pressure-reducing valves, plug valves, and telescoping valves will be replaced, and existing electrical and instrumentation systems will be reconnected to the new clarifier mechanism. These improvements will enhance the functionality and durability of the primary clarifier.
Sugar Creek Water Resource Recovery Facility (WRRF) Ultraviolet (UV) Disinfection System Upgrades
This project involves the replacement of the existing ultraviolet disinfection system at the Sugar Creek Water Resource Recovery Facility. The scope of work includes upgrading the UV disinfection system while utilizing the existing UV channels, extending these channels, and replacing the current level control gates with fixed finger weirs. A new non-potable water (NPW) pump station wet well will be added, and the drain valve of the East Equalization Basin will be replaced. During this upgrade, a temporary disinfection system will be provided to maintain disinfection while the UV system is out of service. Additionally, two existing NPW pumps will be relocated, and three NPW pumps will be replaced in kind. The Filter Backwash Return Pump wet well work will include the installation of a backwash return pump, the necessary piping and valves, and the replacement of a flow meter.
Specialized Roadway Construction Services FY25A
This unspecified contract will provide horizontal construction services on an as-needed basis to the General Services Department. The work includes: traffic control; erosion control; clearing and grading; drainage; milling; asphalt paving; pavement markings; retaining wall; concrete curb, sidewalk, and driveways; pedestrian refuge island, and wheelchair ramps; utility relocation and installations; and related activities.
CLT Medic Space Upfit
An existing space within Charlotte Douglas International Airport, located just off the connector on the Ticketing Level between Concourse A and Concourse A Phase 1, is being renovated to support a new MEDIC Breakroom. The space to be renovated has a combination of rubber tile floor/terrazzo, painted drywall, roll-up door, and acoustical tile ceilings. The new space will have kitchenette millwork with a sink, storeroom with shelving, new porcelain tile ADA restroom with sink, toilet, shower and associated plumbing, electrical and data outlets, new lighting, new water heater and new ductwork. The majority of the work will be performed on Ticketing Level within Security Identification Display Area (SIDA). Some plumbing and data work will be performed from Ramp Level within SIDA adjacent and above a baggage handling system makeup carousel.
Lawyers Rd SW (Harri Ann to Chestnut)
The scope of this project will include 0.34 miles of new 6ft wide concrete sidewalk, driveway improvements, and wheelchair ramps on Lawyers Rd from Chestnut Lake Dr to Harri Ann Dr.
Resurfacing FY 2025-2026
This project consists of street resurfacing and its associated functions throughout the City of Charlotte. Resurfacing is not limited geographically as the possibility exists for paving to be performed anywhere within the city. The project includes traffic control, asphalt and concrete pavement milling, asphalt paving, base failure repair, asphalt surface treatment, utility adjustments, manhole frame and cover replacements, wheelchair ramp installation, sidewalk, curb repairs, bike program elements, and pavement markings.
Concourse A Modifications
This Project aims to modify and relocate existing equipment, replace tables, add an experiential element, and extend tenant services at the Charlotte Douglas International Airport. The modifications of the existing equipment will accommodate a dual-use system at each Gate Counter including the electrical and data infrastructure leading up to the network. There will be a Flight Information Display System” that will need to be relocated in the connecting corridor which includes structural attachments to the building and repairs to the existing Terrazzo. Work hours between 2300 – 0500 EST to prevent disruption to Airport Operations. This project will require 100% badging for all workers.