This project will install a 5 ft. sidewalk and 8 ft. planting strip along Paddock Circle from Hillside Ave to Heather Lane and on Heather Lane from Paddock Circle to Park Rd.
Thermal Hydrolysis System at McAlpine
The proposed project is to fund the design and construction of a two train thermal hydrolysis system at McAlpine Wastewater Treatment Plant.