Collective AH (6633 Brookfield Place, 524 Wilby Drive)

524 Wilby Drive: The culvert will be constructed with a headwall and endwall, with the junction box In between. The 24” plastic pipe will be replaced with 24” RCP.

6633 Brookfield Place: 30” RCP from JB 9 to DCB 8 to be replaced with a 36” RCP , and curb to be added along Alexander Road and standard catch basins to be constructed along the curb.

FY2025A Storm Drainage Repair and Improvement Various Locations

Work performed under this contract will consist of nine (9) stormwater improvement projects throughout Charlotte, NC as illustrated in the plans of the contract documents. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, landscaping and any associated work required by the respective project plan.

Magnolia/Winthrop Storm Drainage Improvement Project

The Magnolia/Winthrop Storm Drainage Improvement Project (SDIP) consists of storm water infrastructure improvements along Ideal Way, Winthrop Avenue and Springdale Avenue. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, water and sewer (relocations, installations and adjustments), traffic control and any other associated work required by the Engineer.

 

Pella Rd 6212 Project

Project consist of joint repairs and the lining of 563 LF of 66 CMP with CIPP.  Three non-standard and three standard structures will be removed/replaced as well as two headwalls.  57 LF of 24 inch RCP will be removed and replaced. A rip rap apron will be revised/installed.  70 LF of an 8″ water main will also be relocated.

Faulconbridge Rd 5749 Project

Project consists of lining 556 LF of 42 inch CMP and 131 LF of 15 inch RCP with CIPP.  Eight existing drainage structures will be removed and replaced and two additional structures will be added. 221 LF of 15″ RCP will be removed and replaced. Chemical grouting joint repair will also be installed at approx. 15 locations throughout the 42″ CMP.

Queens Storm Drainage Improvement Project

The project involves analysis of existing conditions to determine areas suitable for improvement, planning analysis of improvement alternatives, and the design and construction of the needed improvements in the Queens Storm Drainage Improvement Project (SDIP) area.

The Queens Storm Drainage Improvement Project is bordered by East 4th Street to the north, Baxter Street to the south, Caswell Road to the east and Baldwin Avenue to the west.  This project area is within a drainage area of approximately 40 acres and the improvements will include pipe system upgrades and channel improvements.

Eastway Storm Drainage Improvement Project

The project involves analysis of existing conditions to determine areas suitable for improvement, planning analysis of improvement alternatives, and the design and construction of the needed improvements in the Eastway Storm Drainage Improvement Project (SDIP) area.

The Eastway Storm Drainage Improvement Project is bordered by Arnold Drive to the north, Central Avenue to the south, Temple Lane to the east and Eastway Drive to the west.  This project area is within a drainage area of approximately 200 acres and the improvements may include pipe system upgrades and channel improvements.

FBO FUEL LINE REPAIR – Archived

Remove and replace fuel lines servicing the FBO fuel cabinet, flush and abandon fuel lines that previously served

Bank of America; remove and crate two fueling cabinets; miscellaneous repairs to fuel tank farm.

FBO FUEL LINE REPAIR

Remove and replace fuel lines servicing the FBO fuel cabinet, flush and abandon fuel lines that previously served

Bank of America; remove and crate two fueling cabinets; miscellaneous repairs to fuel tank farm.