Queens Storm Drainage Improvement Project

The project involves analysis of existing conditions to determine areas suitable for improvement, planning analysis of improvement alternatives, and the design and construction of the needed improvements in the Queens Storm Drainage Improvement Project (SDIP) area.

The Queens Storm Drainage Improvement Project is bordered by East 4th Street to the north, Baxter Street to the south, Caswell Road to the east and Baldwin Avenue to the west.  This project area is within a drainage area of approximately 40 acres and the improvements will include pipe system upgrades and channel improvements.

Eastway Storm Drainage Improvement Project

The project involves analysis of existing conditions to determine areas suitable for improvement, planning analysis of improvement alternatives, and the design and construction of the needed improvements in the Eastway Storm Drainage Improvement Project (SDIP) area.

The Eastway Storm Drainage Improvement Project is bordered by Arnold Drive to the north, Central Avenue to the south, Temple Lane to the east and Eastway Drive to the west.  This project area is within a drainage area of approximately 200 acres and the improvements may include pipe system upgrades and channel improvements.

FBO FUEL LINE REPAIR – Archived

Remove and replace fuel lines servicing the FBO fuel cabinet, flush and abandon fuel lines that previously served

Bank of America; remove and crate two fueling cabinets; miscellaneous repairs to fuel tank farm.

FBO FUEL LINE REPAIR

Remove and replace fuel lines servicing the FBO fuel cabinet, flush and abandon fuel lines that previously served

Bank of America; remove and crate two fueling cabinets; miscellaneous repairs to fuel tank farm.

CLT Center Phase 14 & 15

The project includes the interior renovation and build-out of existing storage space and other minor renovations in the CLT Center located at 5601 Wilkinson Blvd.  This will include relocating the existing conference room and Tech Help space in order for these spaces to be repurposed

CLT Center Phase 14 15

The project includes the interior renovation and build-out of existing storage space and other minor renovations in the CLT Center located at 5601 Wilkinson Blvd.  This will include relocating the existing conference room and Tech Help space in order for these spaces to be repurposed

RFQ: Design-Builder – CMPD Helicopter Hangar Relocation

Relocation of existing CMPD Helicopter Hangar to an off-site location alongside Billy Graham Parkway will be performed via Alternative Delivery Method, specifically Progressive Design-Build (D/B).  FAA regulatory studies, analysis, coordination and permitting is a requirement of this projects scope.  A Design Build team will be solicited to implement the project scope.

Davidson Eastern Rocky River Sanitary Sewer Outfall – cancelled

This contract will be for the design and construction of a gravity outfall sewer along the Rocky River. This project will consist of approximately 3,600 linear feet of 15-inch and 2,400 linear feet of 12-inch gravity sanitary sewer piping. This outfall is tributary to the existing Rocky River outfall in Cabarrus County and Water and Sewer Authority of Cabarrus County (WSACC) Rocky River Regional Wastewater Treatment Plant.

this opportunity was archived earlier

Davidson Eastern Rocky River Sanitary Sewer Outfall-CANCELLED

This contract will be for the design and construction of a gravity outfall sewer along the Rocky River. This project will consist of approximately 3,600 linear feet of 15-inch and 2,400 linear feet of 12-inch gravity sanitary sewer piping. This outfall is tributary to the existing Rocky River outfall in Cabarrus County and Water and Sewer Authority of Cabarrus County (WSACC) Rocky River Regional Wastewater Treatment Plant.

This opportunity has been cancelled as of 12/18/2024