Modifications to the Convention Center along Stonewall St.
Long Creek Wastewater Treatment Plant – Cancelled
This project provides for up to 11 million gallons per day (MGD) of capacity at a proposed treatment plant at Long Creek, near the Long Creek pump station.
Belmont Lift Station and Forcemain
Design and construction of a Lift Station and Forcemain to transfer wastewater flows from Belmont to the Charlotte Water sanitary sewer collection system.
Oneida Sidewalk
This project will provide sidewalk along Oneida Road from Graham Street to Garvis Drive.
Sweden Rd. Modifications
Site design and modular building
Sweden Rd. Modifications
Site Construction
Beaver Dam Creek West Branch Outfall- Cancelled
This project consists of the design and construction of a sanitary sewer outfall along Beaver Dam Creek West Branch.
Beaverdam Creek Lift Station Improvements New Pump Stations – CANCELLED
This project will provide the necessary upgrades needed to support the proposed development called the River District.
920 White Plains Road Storm Drainage Improvement Project
Storm Drainage Improvement Project. The purpose and need for the Project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.