This project will provide sidewalk along Oneida Road from Graham Street to Garvis Drive.
Sweden Rd. Modifications
Site design and modular building
Sweden Rd. Modifications
Site Construction
Beaver Dam Creek West Branch Outfall- Cancelled
This project consists of the design and construction of a sanitary sewer outfall along Beaver Dam Creek West Branch.
Beaverdam Creek Lift Station Improvements New Pump Stations – CANCELLED
This project will provide the necessary upgrades needed to support the proposed development called the River District.
920 White Plains Road Storm Drainage Improvement Project
Storm Drainage Improvement Project. The purpose and need for the Project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.
Old Dowd Rd Airport 24-inch Water Main – Cancelled
The project is approximately 3600 linear feet of 24 inch water main connecting the existing line at Old Down Road to the 24 inch line on the east side of the airport.
Six Mile Creek PS Improvements-Cancelled
The purpose of this project is to eliminate the long shafts between the pumps and motors. Custom motor stands will be built to position the motors over the pumps. The original two motors for this pump station will also be replaced.
Taggart Creek Outfall Flow Diversion Structure-Cancelled
Project consists of the design and construction of a flow diversion structure.