The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.
Heather/Paddock Sidewalk
This project will install a 5 ft. sidewalk and 8 ft. planting strip along Paddock Circle from Hillside Ave to Heather Lane and on Heather Lane from Paddock Circle to Park Rd.
Thermal Hydrolysis System at McAlpine
The proposed project is to fund the design and construction of a two train thermal hydrolysis system at McAlpine Wastewater Treatment Plant.