McAlpine SR2 and SR3 Stream Repairs – CANCELLED

The purpose of the project is to repair approximately 700 linear feet of stream restoration between 2 different tributaries.  Failing structure will be replaced or repaired such that they function as originally intended.  Repairs will be performed with minimal disturbance to buffer vegetation and vegetation of appropriate size will be re-established after repairs are completed.  Repairs will include but not limited to, removing and resetting boulders and logs for in-stream structures and adding or repairing constructed riffles.

This will not be bid

 

Ashley Road Sidewalk

This project will construct sidewalk along the east side of Ashley Rd from Greenland Ave. to Alleghany St. The scope for this project will include an 8’ planting strip where feasible and 6’ sidewalk, driveway improvements, wheelchair ramps and minor curb adjustments to eliminate pinch points for bike lanes.

Sugar & Irwin WAS Equalization Tanks at McAlpine – Cancelled

Proposed project is to fund a new 31,000 gallon above-equalization grade tank to receive the waste activated sludge (WAS) pumped from Sugar Creek Wastewater Treatment Plant, a new 25,000 gallon equalization tank to receive WAS from Irwin Creek Wastewater Treatment Plant and potentially a new additional 30,000 gallon equalization tank to receive WAS from Long Creek.