Expand and renovate the ticketing and baggage claim lobbies of the existing landside terminal approximately 80-feet by 800-feet
PS & WAS Pipeline from Long Creek to Irwin Creek-Cancelled
Two separate lines will be needed for the solids transfer to handle the primary sludge (PS) and Waste Activated Sludge (WAS) respectively. The PS & WAS Pipelines from Long Creek to Irwin Creek will be approximately 12 miles.
PS & WAS Pipelines from Irwin to McAlpine-Cancelled
Two separate lines will be needed for the solids transfer to handle the PS and WAS respectively. The PS & WAS Pipelines from Irwin Creek to McAlpine Creek Wastewater Treatment Plant will be approximately 12 miles.
5601 Wintercrest Lane Storm Drainage Improvement Project
The Wintercrest Lane Storm Drainage Improvement Project will upgrade existing infrastructure along Wintercrest Lane and Arundel Drive. The improvements will include a box culvert that will run along Wintercrest Lane and Arundel Drive, and will outlet into a channel that connects to Scofield Road. The project will include storm drainage, utility relocation, asphalt paving, curb & gutter, traffic control, and other related construction activities.
Catawba Raw Water Pump Station Cell 1 Rehabilitation (CANCELLED)
Replacement of the entire equipment, piping, master control centers and intake structure. Combined with Catawba Project
Catawba River Water Pump Station Cell 4 – Pump Addition -CANCELLED
This project would add an additional pump to Cell #4 which is sized like the existing, and a capacity of 65 million gallons per day.
The Catawba River Water PS Cell 4 Pump Addition should be cancelled. It has been pushed out in the CIP and will not be available in January 2024. There is no updated timeline on this project.
Plaza Booster Pump Station Upgrades – CANCELLED
CANCELLED – This project is on hold (or potentially canceled) with no anticipated date to advertise in the next 18 months.
This project will include the rehabilitation of the Plaza Road and Idlewild Booster Pump Stations. The rehab will include motor control center, soft start drives, station programmable logic controller control panel, pumps, motors, controls valves, suction & discharge piping, generator/transfer switch and necessary building & roof upgrades.
Plaza Storage Tank Reinforcement Main – CANCELLED
This project includes construction of approximately 6,000 LF of 24 inch water main.
Roofing Replacement (W2R2) – Construction Package 8 Catawba River Pump Station; Roofing Replacement (W2R2) – Construction Package 9 Franklin Water Treatment Plant (WTP)
The Project consists of roofing replacement for Package 8 – Catawba River Pump station Generator Building and Package – 9 the Franklin Water Treatment Plant Aluminum Feed Building, Maintenance Building, Raw Water Pump Station, and High Service Pump Station #2.