Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential and commercial properties.
Various Storm Drainage Improvement Projects
Professional service contracts for various storm drainage improvement projects
FY2020 A-D Storm Water Repair and Improvement
Specialized stormwater services
Archived solicitations link
FY2020A -https://charlottenc.gov/DoingBusiness/Pages/SolicitationDetails.aspx?ID=1120
FY2020B
https://charlottenc.gov/DoingBusiness/Pages/SolicitationDetails.aspx?ID=1121
FY2020C
https://charlottenc.gov/DoingBusiness/Pages/SolicitationDetails.aspx?ID=1158
FY2020D
https://charlottenc.gov/DoingBusiness/Pages/SolicitationDetails.aspx?ID=1159
FY19D Storm Water Repair and Improvement
Specialized stormwater services
Architectural Design Services
Consultant Services
Geotechnical Unspecified Services
Consultant Services
Can Style Lift Stations Phase I – Cancelled
Removal and replacing existing control panels of each lift station, and other miscellaneous site work for installation of a new control cabinet and meter vault.
Wilkinson Boulevard ITS Phase 2 – CANCELLED
This project will install single‐mode fiber optic cable installed in new directionally bored, hand-dug and trenched conduit, existing conduit, and aerial attachments to poles. It will remove existing copper communication cables. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.
Graham Street Extension Intelligent Transportation Systems
This project will install single‐mode fiber optic cable in existing conduits. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.