Uptown Cycle Track

The project includes implementation of a two-way separated cycle track in Uptown Charlotte along portion of 5th and 6th street. It will provide a connection between Little Sugar and Irwin Creek Greenways. The cycle track will be constructed mostly within the existing roadway, currently used as vehicular travel lanes and on‐street parking. Traffic signals will be modified and an at‐grade crossing of the Lynx Blue Line is required. Work includes the construction of cycle tracks and ramps, concrete medians, pavement markings, milling, resurfacing, traffic signals and signage.

FY21 Water and Sewer Repairs

The Project consists of water and sewer repair for various streets, highways, parcels, and utility easements within Mecklenburg County.

FY21 Water Replacements – Contract 1

This contract consists of an undetermined number of individual projects consisting of water and/or sewer replacements, water and/or sewer extensions, and water distribution system reliability improvement projects, which will be assigned by the Project Engineer.

FY21 SMALL DIAMETER WATER AND SEWER SERVICE CONTRACT 2

The Project consists of constructing water and/or sanitary sewer service installations at a single address (single applicant) or water and/or sanitary sewer service dismantlement at a single address (single applicant).

Catawba Pump Station Rehabilitation Project

The Project site is the Catawba Raw Water Pump Station located on Mountain Island Lake, owned & operated by Charlotte Water. The site address is 12548 Pump Station Rd, Charlotte, NC 28216. The work under this project will be primarily in Cells #2 & 3. The electrical work consists of changing the Cell #3 voltage from 2300V to 4160V, including new switchgear, synchronous motor, conduit, cable, etc. as well as re-winding an existing electric pump motor. The civil/mechanical work consists of rebuilding/replacing screens, rehabbing cone valves, and installing a new flow meter vault. The structural work consists of new electrical vault, drywall electrical room, masonry, doors, windows, louvers, and fans. This project also includes upgrades to the fire alarm system for the entire Catawba Pump Station facility.

Tuckaseegee Berryhill Thrift Roundabout

The project will replace the signalized intersection with a roundabout. Project will also provide sidewalks, curb and gutter, driveways, concrete island, wheel chair ramps, retaining wall, storm drainage, asphalt pavement, pavement markings and signage and utility relocation.

Collective Storm Drainage Improvement Projects Series G

This is a collective series storm drainage improvement submittal which contains four (4) separate projects. The projects vary in size and each bring their unique differences. There will be pipe replacement varying in size from 15″- 48″ RCP and 38″x60″ elliptical RCP. Other project replacements include, curb, curb ramp, sidewalk, asphalt, driveways, storm drainage structures and sewer pipe. Project installation includes rip-rap aprons, CIPP liner for a range of pipe from 24″-42″, active shoring, storm drainage pipe and storm drainage structures. Some 24″ RCP will be plugged and filled with excavatable flowable fill.

Eaglewood Storm Drainage Improvement Project

The Eaglewood Storm Drainage Improvement Project will address deficiencies of the storm drainage system located within Eaglewood Avenue right‐of‐way between Pinafore Drive and Pineborough Road. Work includes storm drains, storm drainage structures, sanitary sewer, curb and gutter,  asphalt paving, erosion control, traffic control and other related activities.